My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 9:35:18 AM
Creation date
4/19/2017 2:39:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-53
Res Ord Title
Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Separation Project CP 2012-22
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Structural Practices: Provided below is a description of structural practices that will be implemented, to the <br /> degree attainable, to divert flows from exposed soils, store flows or otherwise limit runoff and the discharge of <br /> pollutants from exposed areas of the site. Such practices may include but are not limited to: perimeter erosion <br /> ' barrier, earth dikes, drainage swales, sediment traps, ditch checks, subsurface drains, pipe slope drains, level <br /> spreaders, storm drain inlet protection, rock outlet protection, reinforced soil retaining systems, gabions, and <br /> temporary or permanent sediment basins. The installation of these devices may be subject to Section 404 of the <br /> Clean Water Act. <br /> The following structural practices will be used for this project: <br /> ® Perimeter Erosion Barrier ❑ Rock Outlet Protection <br /> ❑ Temporary Ditch Check ® Riprap <br /> ® Storm Drain Inlet Protection ❑ Gabions <br /> ❑ Sediment Trap ❑ Slope Mattress <br /> ❑ Temporary Pipe Slope Drain ❑ Retaining Walls <br /> ❑ Temporary Sediment Basin ❑ Slope Walls <br /> ❑ Temporary Stream Crossing ❑ Concrete Revetment Mats <br /> ' ® Stabilized Construction Exits ❑ Level Spreaders <br /> ❑ Turf Reinforcement Mats ❑ Other(specify) <br /> ❑ Permanent Check Dams ❑ Other(specify) <br /> ❑ Permanent Sediment Basin ❑ Other(specify) <br /> ❑ Aggregate Ditch ❑ Other(specify) <br /> ❑ Paved Ditch ❑ Other(specify) <br /> ' D. Treatment Chemicals <br /> Will polymer flocculants or treatment chemicals be utilized on this project: ❑ Yes ® No <br /> r <br /> E. Permanent Storm Water Management Controls: Provided below is a description of measures that will be <br /> installed during the construction process to control volume and pollutants in storm water discharges that will occur <br /> after construction operations have been completed. The installation of these devices may be subject to Section <br /> 1 404 of the Clean Water Act. <br /> 1. Such practices may include but are not limited to: storm water detention structures (including wet ponds), <br /> storm water retention structures, flow attenuation by use of open vegetated swales and natural depressions, <br /> infiltration of runoff on site, and sequential systems(which combine several practices). <br /> The practices selected for implementation were determined on the basis of the technical guidance in Chapter <br /> I 41 (Construction Site Storm Water Pollution Control)of the IDOT Bureau of Design and Environment Manual. <br /> If practices other than those discussed in Chapter 41 are selected for implementation or if practices are <br /> applied to situations different from those covered in Chapter 41, the technical basis for such decisions will be <br /> explained below. <br /> 2. Velocity dissipation devices will be placed at discharge locations and along the length of any outfall channel <br /> as necessary to provide a non-erosive velocity flow from the structure to a water course so that the natural <br /> physical and biological characteristics and functions are maintained and protected (e.g. maintenance of <br /> ' hydrologic conditions such as the hydroperiod and hydrodynamics present prior to the initiation of <br /> construction activities). <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.