F. Approved State or Local Laws: The management practices, controls and provisions contained in this plan will be <br /> ' in accordance with IDOT specifications,which are at least as protective as the requirements contained in the Illinois <br /> Environmental Protection Agency's Illinois Urban Manual. Procedures and requirements specified in applicable <br /> sediment and erosion site plans or storm water management plans approved by local officials shall be described or <br /> incorporated by reference in the space provided below. Requirements specified in sediment and erosion site plans, <br /> site permits, storm water management site plans or site permits approved by local officials that are applicable to <br /> protecting surface water resources are, upon submittal of an NOI, to be authorized to discharge under the Permit <br /> ILR10 incorporated by reference and are enforceable under this permit even if they are not specifically included in <br /> the plan. <br /> Description of procedures and requirements specified in applicable sediment and erosion site plans or storm water <br /> management plans approved by local officials: <br /> ' City of Decatur Land Disturbance Permit <br /> G. Contractor Required Submittals: Prior to conducting any professional services at the site covered by this plan, <br /> I the Contractor and each subcontractor responsible for compliance with the permit shall submit to the Resident <br /> Engineer a Contractor Certification Statement, BDE 2342a. <br /> 1. The Contractor shall provide a construction schedule containing an adequate level of detail to show major <br /> ' activities with implementation of pollution prevention BMPs, including the following items: <br /> • Approximate duration of the project, including each stage of the project <br /> • Rainy season, dry season, and winter shutdown dates <br /> ' Temporary stabilization measures to be employed by contract phases <br /> • Mobilization timeframe <br /> • Mass clearing and grubbing/roadside clearing dates <br /> • Deployment of Erosion Control Practices <br /> • Deployment of Sediment Control Practices(including stabilized construction entrances/exits) <br /> • Deployment of Construction Site Management Practices (including concrete washout facilities, chemical <br /> storage, refueling locations, etc.) <br /> • Paving, saw-cutting, and any other pavement related operations <br /> • Major planned stockpiling operations <br /> • Timeframe for other significant long-term operations or activities that may plan non-storm water <br /> discharges such as dewatering, grinding, etc. <br /> ' • Permanent stabilization activities for each area of the project <br /> 2• The Contractor and each subcontractor shall provide, as an attachment to their signed Contractor <br /> ' Certification Statement, a discussion of how they will comply with the requirements of the permit in regard to <br /> the following items and provide a graphical representation showing location and type of BMPs to be used <br /> when applicable: <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> Page 5 <br />