My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 11:44:44 AM
Creation date
4/19/2017 2:46:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-56
Res Ord Title
Contract with Dunn Company for Street Restoration CP 2017-08
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> SP-1 DESCRIPTION OF WORK <br /> The proposed improvement, designated as Section 17-00708-00-FP, consists of milling <br /> and overlaying a portion of Mound Road in the City of Decatur with hot mix asphalt surface of 1 <br /> '/2"depths. The work includes the removal,replacement,or adjustment of manholes and valve <br /> boxes and sidewalk ramps within the project limits. Crack filling is also included on various <br /> streets in the project. <br /> ' SP-2 HOT MIX ASPHALT MIXTURE REQUIREMENTS <br /> Mixture Use Class D Surface,Level Surface HMA Binder <br /> Patches Binder(See Course <br /> Typical)& <br /> ' Incidental <br /> AC/PG PG 64-22* PG 64-22 PG 64-22* PG 64-22* <br /> Design Air Voids 4.0% @ 4.0%@ 4.0% @ 4.0% @ <br /> Ndes= 50 Ndes=50 Ndes= 50 Ndes= 50 <br /> Mix Com (Gradation) IL 19.0 IL 9.5 IL 9.5 IL-19.0 <br /> Friction Aggregate N.A. Mix C Mix D N.A. <br /> ' * If 20%or more RAP is used, PG 58-22 binder will be required. <br /> SP-3 TRUCK LOADING TO REDUCE MIX SEGREGATION <br /> Description: The mix is to be dumped into the haul truck in mass. Prior to loading, <br /> enough mix is to be in the bin or silo to load the truck. The truck is to be loaded in a maximum <br /> of three dumps. The initial load is to be in the rear 1/3 of the truck,the second dump in the front <br /> 1/3 of the truck and the final dump in the middle. <br /> ' Basis of Payment: This work will not be paid for separately but will be considered <br /> included in the contract. <br /> SP-4 BITUMINOUS MATERIALS (TACK COAT) <br /> Description: This work will consist of utilizing bituminous materials in accordance with <br /> Section 406.02 of the Standard Specifications and as modified herein. The Bituminous Material <br /> allowed as prime on brick, concrete, bituminous or aggregate bases shall be CSS-Ih or RC-70. <br /> Basis of Payment: All labor and materials necessary ary to comply with this specification <br /> will be paid for at the contract unit price per POUND for BITUMINOUS MATERIALS (TACK <br /> COAT). <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.