My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 11:44:44 AM
Creation date
4/19/2017 2:46:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-56
Res Ord Title
Contract with Dunn Company for Street Restoration CP 2017-08
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> SP-9 RESTORATION AND SEEDING ' <br /> Description: Existing grass areas disturbed by construction or removal of the various <br /> work items under this contract shall be restored by properly filling and grading all disturbed areas <br /> with soil that is properly prepared for seed application and then seeding and mulching the area in , <br /> accordance with Sections 250 and 251 of the Standard Specifications for Class IA Seeding and <br /> Method 1 or Method 3 Mulching as directed by the Engineer. Fertilizer will not be required. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be , <br /> considered as included with the various work items involved. <br /> SP-10 SEDIMENT CONTROL AND INLET PROTECTION ' <br /> Description: Care should be used to help minimize any sediment or other fine materials , <br /> leaving the job site. Any open inlet or catch basin shall be protected from sediment infiltration <br /> using the standards outlined in the Illinois Urban Manual for INLET PROTECTION or by using <br /> an equivalent approved by the engineer. ' <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be , <br /> considered as included with the various work items involved. <br /> SP-11 SCHEDULE OF WORK , <br /> Description: The General Contractor and All Sub-Contractors shall furnish in writing, or <br /> electronic form, a weekly schedule by 12:00 P.M.,Thursday,prior to the week being scheduled, ' <br /> so all media, safety services and other City of Decatur Divisions can be notified. All work shall <br /> be approved by the Engineer. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be <br /> considered as included with the various work items involved. <br /> END ' <br /> CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.