My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 11:44:44 AM
Creation date
4/19/2017 2:46:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-56
Res Ord Title
Contract with Dunn Company for Street Restoration CP 2017-08
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> SP-5 TRAFFIC CONTROL(CONTINUED) <br /> The Engineering Division will erect "No Parking" signs 24 hours prior to the start of <br /> work on a street, in an attempt to have all vehicles removed from the street. The City will not be <br /> held responsible for any delays due to the City having to have parked vehicles moved. The <br /> Contractor shall furnish the Engineer with suitable hardwood quality lath for the installation of <br /> temporary"No Parking"signs. <br /> ' Basis of Payment: All labor and materials necessary to comply with this special <br /> provision will not be paid for separately but will be included with the related work items. <br /> SP-6 TEMPORARY PAVEMENT MARKINGS <br /> ' Description: After the street surface has been milled a temporary paint pavement <br /> marking shall be applied to the milled surface to delineate the lanes unless the milled surface will <br /> be overlaid in the same day. Lengths and spacing of markings shall follow the requirements of <br /> Article 703.04 of the Standard Specifications for Road and Bridge Construction. <br /> Basis of Payment: All labor and materials necessary to complete this work will be <br /> ' included in the contract unit price per FOOT for TEMPORARY PAVEMENT MARKING-LINE <br /> 4 INCH. <br /> SP-7 CRACK FILLING <br /> Description: Except as directed by the engineer, all CRACK FILLING must be <br /> completed only after all other work on the entire job has been completed. <br /> Basis of Payment: All labor and materials necessary to complete this work will be <br /> included in the contract unit price per POUND for CRACK FILLING, of the type and depth <br /> specified. <br /> SP-8 SIDEWALKS, CURBS,AND CURB RAMPS <br /> Description: All sidewalks, and curb ramps must be replaced and open to pedestrian <br /> traffic within 7 calendar days of removal. <br /> Basis of Payment: This work will not be paid for separately but shall be considered as <br /> included with the various work items involved. <br /> ' Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.