Laserfiche WebLink
Exhibit A <br /> 1. Prepare General Plan and Elevation sheet. <br /> 2. Prepare stage construction details sheet(s). <br /> 3. Prepare temporary pedestrian bridge sheets, if necessary <br /> 4. Prepare superstructure deck beam sheets. <br /> 5. Prepare approach slabs sheets. <br /> 6. Prepare parapet/bicycle railing sheet. <br /> 7. Prepare bridge walkway details <br /> 8. Prepare construction joint details sheet. <br /> 9. Prepare deck drain details. <br /> 10. Prepare abutment(4)repair details sheet. <br /> 11. Prepare pier(4) repair details sheet. <br /> 12. Prepare quantity summary tables and schedules. <br /> Task 600—Roadway and Drainage Design <br /> 1. Field Check the project after the topography survey is complete. Take pictures of existing conditions <br /> and create a photo log. <br /> 2. Confirm existing sidewalks are ADA compliant. <br /> 3. Set existing centerlines and proposed roadway geometrics. <br /> 4. Set proposed profile for SN 058-3036. <br /> 5. Perform the hydraulics calculations to size the storm sewer and drainage structures within roadway <br /> improvements. <br /> 6. Design temporary drainage and interim drainage to accommodate the construction staging and <br /> maintenance of traffic requirements. <br /> 7. Compile drainage computation for submittal to the City of Decatur. <br /> 8. Request traffic data from the Macon County Sheriff's Office. <br /> 9. Prepare and submit an Environmental Survey Request Form. <br /> 10. Attend FHWA Coordination Meetings. <br /> 11. Prepare and submit the Project Notification and Review Form. <br /> 12. Prepare a Draft and Final Project Development Report. <br /> a. Complete BLR Form 22210 Local Project Development Report for Group II Categorical <br /> Exclusions and Design Approval. <br /> b. Create a Project Location Map Exhibit. <br /> c. Create a Functional Classification Map Exhibit. <br /> d. Create a Utility Coordination Exhibit. <br /> Scope 6-05-2017 A-3 <br />