My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-88 Agreement with AECOM to Provide Design Services to Improve Mound Road - Spring Creek Bridge CP 2017-06
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-88 Agreement with AECOM to Provide Design Services to Improve Mound Road - Spring Creek Bridge CP 2017-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2017 12:15:13 PM
Creation date
7/14/2017 2:33:19 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-88
Res Ord Title
Agreement With AECOM to provide design services to improve the Mound Road - Spring Creek Bridges CP 2017-06
Department
Public Works
Approved Date
7/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> e. Create an exhibit showing the existing and proposed typical sections for the roadway and <br /> bridges. <br /> f. Create a Structural Master Report Exhibit. <br /> g. Create an Accident Data Exhibit. <br /> h. Create a Wetlands Map Exhibit. <br /> i. Coordinate with the Army Corp of Engineers. <br /> j. Coordinate with adjacent property owners. <br /> k. Perform a Special Waste Screening, if required, as part of the Environmental Survey Request. <br /> 13. Develop a traffic control scheme for Stage I and Stage Il construction, if staging utilized. Develop <br /> an alternate detour route(s) if full closure. Coordinate temporary pedestrian accommodations with <br /> the City during construction. <br /> 14. Request J.U.L.I.E. design locate and create a utility company contact data base including contact <br /> names, addresses, telephone numbers and e-mail addresses. <br /> 15. Submit preliminary plans to all know utilities within the project limits. The Utility Exhibit will <br /> include the existing topo, alignments and existing utility information as surveyed. <br /> 16. Existing detector loops west of the SN 058-3036(Center Mound Road Bridge) controls the traffic <br /> signals at Camelot Drive. The traffic signals will be reconfigured during construction to run without <br /> the detector loops. The temporary signal timing will be determined by the City of Decatur. The <br /> location of the signal heads may need to be adjustment for each stage of construction. <br /> 17. Coordination of approach slab and detector loops with roadway/profile adjustments. <br /> Task 700—Roadway Plans <br /> 1. Review As-Built Plans and/or Utility Exhibit markups provided by the utility companies. <br /> 2. Revise existing utility locations based on field check. Submit Preliminary Plans to utility companies <br /> showing revised utility locations. <br /> 3. All sheets will be prepared as described in Chapter 63 of the IDOT BDE Manual. <br /> 4. Prepare Cover Sheet. <br /> 5. Prepare Index of Sheets,List of District/City Standards, List of IDOT and City of Decatur Standards <br /> and the Mixture Requirements Table. <br /> 6. Prepare General Notes and Commitments Sheet. <br /> 7. Prepare Summary of Quantities Sheets. <br /> 8. Prepare Existing Typical Section Sheets. <br /> 9. Prepare Proposed Typical Section Sheets. <br /> 10. Prepare Schedule of Quantities Sheets. <br /> 11. Prepare Alignment,Ties and Bench Mark Sheets. <br /> 12. Prepare Removal Plans. <br /> 13. Prepare Roadway Plan and Profile Sheets including the drainage items. <br /> Scope 6-05-2017 A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.