Laserfiche WebLink
Item Coversheet Page 1 of 2 <br /> Public Works <br /> DATE: 6/14/2017 <br /> MEMO: 2017-39 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Tim Gleason,City Manager <br /> Richard G.Marley,P.E.,Public Works Director <br /> SUBJECT: <br /> Resolution Authorizing an Agreement with AECOM Technical Services,Inc.to Perform Bridge Design Services for Mound <br /> Road/Spring Creek West and Middle Bridges,City Project 2017-06 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached Resolutions authorizing the Mayor to sign and the City Clerk to <br /> attest to the following items: <br /> 1. Resolution authorizing a professional engineering services agreement between the City of Decatur and AECOM Technical <br /> Services,Inc.,(AECOM)to perform bridge design services for the Mound Road/Spring Creek West and Middle bridges for <br /> a fee of$339,100. <br /> 2. Resolution appropriating$339,100 in State Motor Fuel Tax(MFT)funds to pay for the agreement with AECOM to perform <br /> bridge design services for the subject bridges. <br /> BACKGROUND: <br /> At the request of the City in early 2016,the Illinois Department of Transportation(IDOT)performed a rating inspection of the <br /> Mound Road/Spring Creek West Bridge. On March 24,2016,the Department issued a letter to the City lowering the rating of the <br /> bridge deck and superstructure to a"3"(Serious Condition)on a scale from 0-9(O=Required Closed,9=New). Acting on an <br /> additional request from the City,IDOT performed a rating inspection of the Mound Road/Spring Creek Middle Bridge earlier this <br /> year. On February 7,2017,IDOT issued a letter to the City lowering the rating of the bridge deck and superstructure to a <br /> "2"(Critical Condition)and ordered that the bridge be inspected every 12 months to ensure its continued safe condition. IDOT <br /> recommended that the City look to replace the decks and superstructures on both bridges in the near future. The bridge <br /> superstructures include the entire bridge structure above the pier tops,generally the driving service(deck)and the beams or girders <br /> supporting the driving surface. <br /> The City has secured$1.9 million in Federal Surface Transportation funding to cover 80%of the estimated$2/3 million <br /> construction cost to replace the deck and superstructure of both bridges in 2019. <br /> On March 8,2017,the Public Works Department issued a request for proposals and qualifications from area engineering firms to <br /> provide design services to replace the deck and superstructures for the Mound Road/Spring Creek(West)Bridge and Mound <br /> Road/Spring Creek(Middle)Bridge as shown on the attached location map. <br /> Proposals were received March 29,2017. Eight firms responded to the City's request and submitted formal statements of <br /> qualifications. Public Works Department staff conducted in-person interviews with three of the proposing firms and recommends <br /> AECOM Technical Services,Inc.as the firm best able to serve the City in performing the requested design services. <br /> Engineering Services Agreement <br /> The Design services are to prepare design drawings and IDOT and FHWA approvals to perform the bridge construction work in <br /> 2019 and will include the following services: <br /> 1. Perform topographic surveys of the two bridges. This work will also include gathering information on Spring Creek. <br /> 2. Prepare hydraulic reports for each bridge to identify any affect the structures may have on Spring Creek and determine if <br /> there are scour concerns with the structure footings. <br /> 3. Perform the National Bridge Inventory System(NBIS)inspections of each bridge during the construction and design period <br /> as required by IDOT. <br /> https:Hdecatur.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=1190 7/3/2017 <br />