My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-94 Professional Engineering Services Agreement Chastain & Associates, LLC to Complete Design of the McKinley Sewer Rehabilitation Project CP 2017-22
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-94 Professional Engineering Services Agreement Chastain & Associates, LLC to Complete Design of the McKinley Sewer Rehabilitation Project CP 2017-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 9:14:56 AM
Creation date
8/10/2017 9:12:49 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-94
Res Ord Title
Professional Engineering Services Agreement with Chastain & Associates, LLC to Complete Design of the McKinley Sewer Rehabilitation Project CP 2017-22
Department
Public Works
Approved Date
8/7/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and McKinley Avenue. A section of the sewer also extends south along Monroe Street to Harrison <br /> Avenue. See the attached location map. <br /> Initial inspections of the sewer indicated some flow line deterioration, water infiltration through joints <br /> with some separated joints, and cracks. Figure 2 below shows some images of the sewer condition. <br /> Gushing Infiltratian "ALL <br /> Mineral Deposits <br /> a <br /> McKinley-60"pipe McKinley-42"pipe <br /> Figure 2. Inspection photos depicting the general condition of the McKinley Avenue Sewer. <br /> Rehabilitation Plan <br /> The total rehabilitation cost including engineering and construction inspection was originally estimated <br /> at$583,000 in the Facilities Plan Summary. The original inspections were completed in 2008 with <br /> partial videos, some additional televised inspections were needed to finish and verify the condition. The <br /> new inspection videos used High Definition cameras that revealed greater damage in the sewers than <br /> was originally believed. Figure 3 shows the change in image from 2008 to 2014 using the high <br /> definition sewer inspection cameras. <br /> The design of the McKinley Sewer was started as a combination project with the 7th Ward Sewer but <br /> was put on hold as the rehabilitation costs for 7th Ward Sewer increased. The design was at <br /> approximately 70%when the McKinley portion of the project was put on hold and the project was <br /> separate. The updated costs to rehabilitate the McKinley Sewer are in Table 1 below. <br /> Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.