My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-13 Professional Services Agreement AECOM for Ellen and Division Inflow and Infiltration Reduction
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-13 Professional Services Agreement AECOM for Ellen and Division Inflow and Infiltration Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 4:28:46 PM
Creation date
2/6/2018 4:28:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-13
Res Ord Title
Approve Professional Services Agreement with AECOM Technical Services, Inc. for Ellen and Division Inflow and Infiltration Reduction Project City Project 2018-01
Department
Public Works
Approved Date
2/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-9 Page <br /> City of Decatur,It. <br /> Ellen and Division I&I Reduction Program <br /> required apparatus.pparatus. Itis assumed that AECOM will not need to pay for the meter or for the <br /> water utilized during testing. <br /> • Water from the hydrant will be dyed green at the point of filling. <br /> • After the storm sewer is filled with green dyed water, the sanitary sewer will be checked to <br /> determine the extent of any dye leakage. <br /> • A dye water flooding form will be completed for each dye water flooding set-up. The dye <br /> water flooding form will include the following information: <br /> ■ Technicians performing the test <br /> ■ Date of the test <br /> ■ Manholes that were checked for dye leakage <br /> ■ Degree(Heavy, Moderate, or light)of dye leakage <br /> ■ Estimated quantity of 1/1 due to flooding/dye leakage <br /> ■ A sketch of each test site including: <br /> o Street names <br /> o Manhole numbers <br /> o Actual dye leakage locations <br /> o Plug locations <br /> o Hydrant location <br /> ■ Video and photographic documentation <br /> To conduct the dye water flooding, access to water via area hydrants will be required.AECOM will <br /> coordinate hydrant set-ups with the City and factor that time into the project schedule. <br /> AECOM will provide rehabilitation/repair recommendations and cost estimates based on the findings <br /> of the dye water flooding. <br /> Deliverables: <br /> • Dye Water Flooding Results and Recommendations(see Task 8—Report) <br /> Task 8: ELLEN/DIVISION SANITARY SEWER ALTERNATIVES ANALYSIS REPORT <br /> AECOM will develop a report to document all the work performed in Tasks 1-7. The report will include <br /> an executive summary, a summary and description of each activity undertaken, the results of each <br /> task, a summary of identified system deficiencies and sources of 1/I, theoretical reduction of quantified <br /> 1/1, prioritized rehabilitation, a summary of alternatives (including an Engineer's Opinion of Probable <br /> Construction Cost), and a recommended alternative for eliminating the SSO at manhole 10-13. <br /> Deliverables: <br /> • Preliminary Results Memorandum (5 hard copies, 1 electronic PDF) <br /> • Draft Report(5 hard copies, 1 electronic PDF) <br /> • Final Report(5 hard copies, 1 electronic PDF) <br /> Task 9: PROJECT MANAGEMENT <br /> This task includes all project management related activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.