My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:24:41 PM
Creation date
6/4/2018 11:31:54 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-44
Res Ord Title
Contract with Dunn Company for 2018 Local Motor Fuel Tax Street Improvements City Project 2018-25
Department
Public Works
Approved Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Description <br /> The 2018 asphalt project will perform street reconstruction on streets that have deteriorated over <br /> time due to age, freeze-thaw cycles, and traffic loads. Reconstruction involves removing failed <br /> sections of pavement, and adding cement to the underlying soil to stiffen and strengthen the road <br /> base. Asphalt milling and overlay work will occur along streets that have surface distresses where <br /> replacing the surface will help prevent costlier repairs in the future. There are also several concrete <br /> and brick streets which will be overlaid with a layer of asphalt to seal these old roads and to create a <br /> smoother riding surface. In total, 6.67 lane miles of the City's 825 total lane miles will be <br /> rehabilitated as part of this project. <br /> The proposed street list for Street Im rovement is as follows see attached location ma s): <br /> Length Length <br /> Street Begin End Surface Treatment (Lane <br /> (feet) Miles <br /> Decatur St. Oakland Ave. Monroe St. Mill&Overlay 2605 0.99 <br /> Stone St. Cantrell St. Johns St. Mill&Overlay 1850 0.70 <br /> Lawrence St. 16d`St. 19th St. Soil Cement Recon 1300 0.49 <br /> Whitmer St. Jasper St. 16d'St. Soil Cement Recon 1265 0.48 <br /> Gebhart Ct. Sawyer St. End of Street Asphalt Overlay 95 0.04 <br /> East Court Dr. Mound Rd. End of Street Asphalt Overlay 1400 0.53 <br /> Fitzgerald Rd. Lost Bridge Rd. 3597 E. Concrete Overlay 2400 0.91 <br /> Fitzgerald Rd. <br /> Calhoun St. Grand Ave. End of Street Brick Overlay 1275 0.48 <br /> Downtown N.Main St. E.Prairie St. Mill&Overlay 380 0.07 <br /> Alley <br /> Stephanie Dr. Water St. Constant View Mill&Overlay 350 0.13 <br /> r. <br /> Constant View Mound Rd. Stephanie Dr. Mill&Overlay 655 0.25 <br /> Dr. <br /> E.Main St. East Ave. 22nd St. Brick Overlay 2845 1.08 <br /> 181'St. E.Main St. Prairie St. Brick Overlay 275 0.10 <br /> Decatur St. Monroe St. Union St. Mill&Overlay 1115 0.42 <br /> Total Length 17,810 6.67 <br /> In addition to the paving on these streets, concrete work including sidewalk curb ramps, curb and <br /> gutter, and catch basin work,will be performed. <br /> Website <br /> A website has been set up to track the progress of the projects being funded by the local motor fuel <br /> tax, www.buildingdecatur.com. It will contain project updates along with photos and videos. <br /> —2— <br />
The URL can be used to link to this page
Your browser does not support the video tag.