My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-129 Resolution to Approve a Professional Engineering Services Agreement with AECOM Technical Services, Inc. for Brush College / Faries Parkway Grade Separation, City Project 2009-33
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-129 Resolution to Approve a Professional Engineering Services Agreement with AECOM Technical Services, Inc. for Brush College / Faries Parkway Grade Separation, City Project 2009-33
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:42 AM
Creation date
10/2/2018 9:50:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-129
Res Ord Title
R2018-129 Resolution to Approve a Professional Engineering Services Agreement with AECOM Technical Services, Inc. for Brush College / Faries Parkway Grade Separation, City Project 2009-33
Department
Public Works
Approved Date
10/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Geotechnical Considerations <br /> Previously prepared Soil Geotechnical Reports (SGR)for the proposed structures prepared with the Phase I <br /> design will be utilized. An update to this report including additional soil borings and a SGR Technical <br /> Update Memo will be prepared. <br /> One Roadway Geotechnical Report {RGR) for the roadway improvements and reconstruction of Brush <br /> College Road over Faries Parkway, including boring logs and soil profiles for the ramps and Access road(s). <br /> The report will include recommendations for pavement support and Mast Arm/Signal Arm foundations. <br /> It is assumed that the City will obtain access from property owners for geotechnical work.A letter wi1l be <br /> drafted and provided on City letterhead. <br /> Drainage Memorandum <br /> For the main Brush College Corridor AECOM has asked WHKS to provide drainage design and plans. <br /> Since a Phase I drainage report was not cornpleted,the scope of work will include analyzing the existing or <br /> baseline conditions and providing a report. <br /> Interconnect Report <br /> After coordination with the ICC on whether the traffic signal along Faries Parkway will need to be <br /> interconnected to the CN Railroad flashing Lights and Gates system and an interconnect report will need to <br /> be prepared for the ICC. <br /> Task 00404 Phase II Design -Plans Special Provisiorxs and Estiniates (overview) <br /> Roadwav <br /> It is anticipated that there will on}y be one construction package prepared for this project with multiple <br /> construction stages.Initial review of the project during Phase I Update-VE CR ABC will determine if there <br /> are viable portions of the project that should be constructed in the initial stages of the construction <br /> sequencing.This will then be discussed with the City and IDOT. <br /> Structural Design <br /> The overpass structure will be designed in accordance with the latest AASHTO LRFD Bridge Design <br /> Speci�cations, the Illinois Department of Transportation (IDOT)Bridge Manual,and the Norfolk Southern <br /> Public Projects Manual. <br /> Overpass Design—Sunerstructure and substructure <br /> Perform design of all elements of superstructure and substructures,including deep foundation elements. <br /> From the current SGR,it is anticipated that steel H piles will be utilized for the deep foundations. <br /> Scope 9-21-18 A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.