Laserfiche WebLink
_ i �m� <br /> 4. Com lete the e i r h <br /> p d s gns fo t e bridge and roadways that wiil need to be constructed and <br /> provide construction plans far bidding. <br /> 5. Prepare the project specifications with the bidding infarmation required by IDOT. <br /> 6. Coardinate the preparation of construction plans and specificatians with area businesses and <br /> stakeholders. <br /> 7. Prepare right af way drawings for the City's right af way negatiator, Crawfard, Murphy& <br /> Tilly, to secure the necessary right of way far the project. <br /> The Illinois Department af Transportation and the Fecleral Highway Administration require that the <br /> City approve its own Engineering Services Agreement (Item 3} and a Prelimznary Engineering <br /> Services Agreement for Federal Participation{Item 4}. <br /> Funding <br /> The proposed engineering services fee is $3,349,667. The prel'rminary praject estimate is given in the <br /> table below. In 2017, the City applied for and received notice of$12 million in Railroad Grade <br /> Crossing Protection funds far this project through the Illinois Commerce Co�lmission{ICC}. When <br /> the City received notice of the Freight Program funds, a petition was prepared and filed with the ICC <br /> to gain access to the Grade Crassing Protection funding that was allocated for this project. That <br /> petition is now pending before the ICC with anticipated actian within the next 6 months. Due to the <br /> pending ICC funds,the Freight Program did nat fully fund the engineering services. The Public <br /> Agency Agreement for Federal Funding will be modified and brought befare Cauncil far amendment <br /> to the full arnount when the ICC funding is approved. <br /> Nate that the estimakes provided in Table 1 below, were prepared early in the project development <br /> and will change as the design progresses, property is purchased, and the project moves forward. <br /> Table 1.Preliminary Project Estirnates <br /> Prnaect Total Proposed Illinois Jobs Proposed Proposed <br /> Estimatad Freight Ci Funds <br /> Phase Cost Funds Now! Funds ICC Funds State MFT <br /> Right of Way $��400,p00 $3,800,OOQ $2,000,000 $640,04Q <br /> Ac+quisition <br /> Engineering $4,lOQ,OQO $2,400,40Q $1,4Q4,000 $70Q,000 <br /> Utility $3,604,000 $2,004,Q00 $l,OQ0,000 $600,000 <br /> Relocation <br /> Construction $2�,800,000 $16,80fl,000 $10,000,000 $1,000,000 <br /> Totals $41,900,000 $25,000,000 $2,000,000 $12,OQO,QOp $2,900,OQ0 <br /> POTENTIAL OBJECTION: There are no known objectians. <br /> � � � <br />