<br /> 4. Com lete the e i r h
<br /> p d s gns fo t e bridge and roadways that wiil need to be constructed and
<br /> provide construction plans far bidding.
<br /> 5. Prepare the project specifications with the bidding infarmation required by IDOT.
<br /> 6. Coardinate the preparation of construction plans and specificatians with area businesses and
<br /> stakeholders.
<br /> 7. Prepare right af way drawings for the City's right af way negatiator, Crawfard, Murphy&
<br /> Tilly, to secure the necessary right of way far the project.
<br /> The Illinois Department af Transportation and the Fecleral Highway Administration require that the
<br /> City approve its own Engineering Services Agreement (Item 3} and a Prelimznary Engineering
<br /> Services Agreement for Federal Participation{Item 4}.
<br /> Funding
<br /> The proposed engineering services fee is $3,349,667. The prel'rminary praject estimate is given in the
<br /> table below. In 2017, the City applied for and received notice of$12 million in Railroad Grade
<br /> Crossing Protection funds far this project through the Illinois Commerce Co�lmission{ICC}. When
<br /> the City received notice of the Freight Program funds, a petition was prepared and filed with the ICC
<br /> to gain access to the Grade Crassing Protection funding that was allocated for this project. That
<br /> petition is now pending before the ICC with anticipated actian within the next 6 months. Due to the
<br /> pending ICC funds,the Freight Program did nat fully fund the engineering services. The Public
<br /> Agency Agreement for Federal Funding will be modified and brought befare Cauncil far amendment
<br /> to the full arnount when the ICC funding is approved.
<br /> Nate that the estimakes provided in Table 1 below, were prepared early in the project development
<br /> and will change as the design progresses, property is purchased, and the project moves forward.
<br /> Table 1.Preliminary Project Estirnates
<br /> Prnaect Total Proposed Illinois Jobs Proposed Proposed
<br /> Estimatad Freight Ci Funds
<br /> Phase Cost Funds Now! Funds ICC Funds State MFT
<br /> Right of Way $��400,p00 $3,800,OOQ $2,000,000 $640,04Q
<br /> Ac+quisition
<br /> Engineering $4,lOQ,OQO $2,400,40Q $1,4Q4,000 $70Q,000
<br /> Utility $3,604,000 $2,004,Q00 $l,OQ0,000 $600,000
<br /> Relocation
<br /> Construction $2�,800,000 $16,80fl,000 $10,000,000 $1,000,000
<br /> Totals $41,900,000 $25,000,000 $2,000,000 $12,OQO,QOp $2,900,OQ0
<br /> POTENTIAL OBJECTION: There are no known objectians.