My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, for Annual Street Restoration City Project 2019-08
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, for Annual Street Restoration City Project 2019-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:39 AM
Creation date
5/23/2019 5:27:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-75
Res Ord Title
R2019-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, for Annual Street Restoration City Project 2019-08
Department
Public Works
Approved Date
5/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RETURN WITH BiD <br /> Cpunty Macan <br /> PROP4SAL ���Public Agency City of Decatur <br /> Secti�an Number t9-Utf90&Ufl-FP <br /> Route Various Streets <br /> 1. Proposal of �(jl�i� ��'1.��� („�11��c�I�Q A� ,�4�% ,��'��.j}L(� .�i1.Tj� . <br /> for the improvement af the above section by ths construction of Sh~eet Restoration,City Project 2Q 19-US <br /> Resurface the road with 1.5 inch mill and I.5 inch overiay.Class D patches and <br /> crack filling in various lacations. ^ <br /> a total distance of 14248.00 feet,of which a distance of 14248.00 feet, ( 2,698 rniles}are ta be improved. <br /> 2. The plans for the propased work are those prepared by Gity of Decaiur Engineering Division <br /> and approved by the Dgpartrnent of Transporta#ion an <br /> 3. The sgecificafions referred to herein are#hose prepared by the Department of Transpastatian and designated as <br /> "Standard Specificatians for Road and Bridge Construction"and the"Supplemental SpecP�eatic�ns and Reeurring Speciat <br /> Provisionsg thereto, adopted and in effect on the date of invitation for bids. <br /> 4. The und�rsigneci agrees to accept, as�►art ofi#he contract, the applicable Special Provisions indicated on the"Check <br /> Sheet for Recurring Speciaf Provisians'confained in this proposai. <br /> 5. The undersigned agrees to comptete the work within working days or by 07/12/2019 <br /> unless additianal time is granted in accordance with fhe specifications. <br /> 6. A proposai guaranty in the proper amount, as specified i� BLRS Special Pravisian for Bidding Requirements and <br /> CondiEions for Contraef Proposals,will be required. Bid Bonds wiil be ailawed as a praposal guaranty.Accompanying this <br /> praposa! is either a bid band if ailowed, on Department forrn BI�R 12230 or a proposal guaranty check,complying with the <br /> specifications, made payable to: <br /> City of Decatur Treasurer of <br /> The arnaunt of the check is t�1� tr.�v�4 � � I"�. ( �����r�!''� • ( )_ <br /> T. fn fhe event that ane propasal guaranty check is intended ta cover twa or mare proposals, the amount must be equal to <br /> the sum of#he propasal guaranties,which wou#d be required for each individua!propasai. lf the proposat guaranty check <br /> is ptaced in another proposal, it will be found in#he proposal for: Section Number 19-00908-00-FP <br /> 8. The successfuf bidder at the time of execution of the cantract will be required to deposit a contract bond#ar the fu8 <br /> amount of the award. When a contract bond is not required, the proposal guaranty check will be hetd in lieu theseof. !#this <br /> propasaE is accepted and the undersigned faifs to execu#e a contracf and contract band as required,it is hereby agreed <br /> Ehat the Bid Bond or checK shaEl be forfeited to the Awarding Authority. <br /> 9. Each pay iter7t shoutd have a unit price and a totai price. tf na tofaf price is shown ar if there is a discrepancy between the <br /> product of the unit price muftiplied by the quantitY,the unit price shall govem. [f a uni#price is omitted,the total price wili <br /> be divided by the quantity in arder to establish a unit prioe. <br /> 10. A bid wiU be decfared unacceptabfe if neither a unit price nor a total price is shown. <br /> 11. 7he undersigned subrnits herewith#he schedule of prices on BL.R 322at1a covering the work ta be perforrned under this <br /> contract. <br /> 12. 7he undersigned further agrees that if awarded the caniract for the sect(ons contained in ihe c�mbinations on <br /> BLR 12200a,the wark shall be in accordance with the requi�ements of each individual proposa!for the multiple bid <br /> spec�ed in fhe Schedule for Multipie Bids below. <br /> Printed 4/15/2019 Page 3 of 6 BlR 12204{Q1l08t14) <br />
The URL can be used to link to this page
Your browser does not support the video tag.