Laserfiche WebLink
2019 Street Restoration Project <br /> City Project 2019-08 <br /> Section No. 19-00908-00-FP <br /> May 2,2019 <br /> ADDENDUM NO. 1 <br /> TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> 2019 STREET RESTORATION PROJECT <br /> CITY PROJECT 2019-08 <br /> SECTION NO. 19-00908-00-FP <br /> DATED MAY 2,2019 <br /> AD-1-1 NOTICE <br /> 1.01 This Addendum No. 1 dated May 2, 2019,to the Plans, <br /> Specifications and Contract Documents for the above captioned <br /> project, supersedes all contrary and conflicting information of the <br /> above mentioned bid proposal documents,which axe hereby <br /> supplemented in certain particulars as follows: <br /> AD-1-2 SPECIAL PROVISIONS <br /> 2.01 Replace the table in SP-2 "Hot Mix Asphalt Mixture <br /> Requirements"on page 4 of the General Conditions, Special <br /> Provisions and Supplemental Specifications,with the following <br /> table: <br /> Mixture Use Class D Surface,Level Surface HMA Binder <br /> Patches Binder(See Couxse <br /> Typical) & <br /> Incidental <br /> AC/PG PG 64-22* PG 64-22 PG 64-22* PG 64-22* <br /> Design Air Voids 4.0% @ 4.0%@ 4.0%@ 4.Q%@ <br /> Ndes=50 Ndes=50 Ndes=50 Ndes=SQ <br /> Mix Com Gradation IL 19.0 IL 9.5 IL 9.5 IL-19.0 <br /> Friction A e ate N.A. Mix C Mix C N.A. <br /> * If 20%or more RAP is used,PG 58-22 binder will be required. <br />