My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-97 Resolution Authorizing Agreement with Itron, Inc. to Complete the Version 5.5 Software Upgrade for the Automatic Meter Reading System
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-97 Resolution Authorizing Agreement with Itron, Inc. to Complete the Version 5.5 Software Upgrade for the Automatic Meter Reading System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2022 4:38:47 PM
Creation date
6/21/2022 4:38:45 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-97
Res Ord Title
R2022-97 Resolution Authorizing Agreement with Itron, Inc. to Complete the Version 5.5 Software Upgrade for the Automatic Meter Reading System
Department
Information Tech
Approved Date
6/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�����iery <br /> b. Participate knRlRONscheduled progress meetings. Participants include, odminimum, OlRON <br /> services, Technical Consultant, and CUSTOMER Project Manager. Customer will provide on <br /> SME on theirCIS System thatwill produce needed outputfrom CIS to support integration design. � <br /> 2. Software Implementation and Technical Support <br /> a. Install all 3rd party software (operating oyob»m, database software, firewall ooMvvane, etc.) <br /> according hnCCFN installation documentation. <br /> b. Provide server hardware based onCCFNinstallation documentation . <br /> o. Update all CCUs orRepeaters 0ocurrent firmware versions. <br /> d. Verify pre-install tasks and testing after the Software installation. <br /> o. Provide |TRON resources with required access to perform CCFN upgrade on local server <br /> hardware. <br /> 3. Integration and configuration <br /> a. Update configuration data and produce desired reading import files. <br /> b. Complete any Interface development,CIS integration updates,and other key system upgrades <br /> within CUSTOMER datacenter,aorequired <br /> 4. Testing <br /> a. Perform and test any integration toCIS and other downstream systems. <br /> b. Support|TRON-ledFunctional Testing. <br /> o. Conduct all other system orUATtesting for the new CCFNinstallation. <br /> d. Complete System Testing in accordance with published Project Schedule and as defined in <br /> approved Test Plan. <br /> 5. Training <br /> a. Participate intraining tasks and deliverables inaccordance with the Training Section. <br /> G. Transition <br /> m. Support transition ofthe Project muoutlined inthe Transition to ITRON GSS Section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.