My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-109 Resolution Authorizing Agreement with Concentric Integration, LLC for South Water Treatment Plant PLC Upgrades Phase I City Project 2022-32
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-109 Resolution Authorizing Agreement with Concentric Integration, LLC for South Water Treatment Plant PLC Upgrades Phase I City Project 2022-32
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2022 4:03:29 PM
Creation date
7/6/2022 4:03:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-109
Res Ord Title
R2022-109 Resolution Authorizing Agreement with Concentric Integration, LLC for South Water Treatment Plant PLC Upgrades Phase I City Project 2022-32
Department
Public Works
Approved Date
7/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rd <br /> 11 <br /> CONCENTRIC <br /> I N T E G R AT I O N <br /> iv. Qty One(1)Allen Bradley 1756-IB16 DC digital input card <br /> v. Qty five(5)Allen Bradley 1756-OW161 relay output cards <br /> vi. Qty five(5)Allen Bradley 1756-IF161H isolated analog input cards <br /> vii. Qty four(4)Allen Bradley 1756-01`81 isolated analog output cards <br /> viii. Qty eleven(11)Allen Bradley 1756-AI16120VAC digital input cards <br /> b. Qty one(1)APC SmartUPS <br /> c. Other miscellaneous components as required for a complete panel, including circuit breakers,fuses, <br /> terminal blocks,wiring duct,etc. <br /> 2. Qty one(1)Allen Bradley 2715P-T12WD 12"operator touchscreen interface <br /> 3. Qty one(1)Serial to Ethernet Bridge Adapter <br /> Labor <br /> Proiect Management <br /> 1. Plan,schedule,and coordinate the activities that must be performed to complete the Project. <br /> 2. Coordinate a phone-based kick-off call. <br /> 3. Provide monthly project status updates via email. <br /> 4. Attend coordination meetings as required. <br /> Panel Design <br /> 1. Control Panel Design <br /> a. Design one panel to replace the current three control panels currently housing SCC1,SCC1A,and SCC6 <br /> b. Design one termination panel (using existing control panel enclosure) for the extension of select <br /> SCC1A panel 10 wires. <br /> Programming <br /> 1. Telemetry logic migration <br /> a. Migrate the telemetry communications logic into the existing SCC1C 1756-172 ControlLogix processor. <br /> b. Program the protocol serial to Ethernet bridge to bridge telemetry PLCs through the existing serial <br /> radio network. <br /> 2. PLC Logic Migration <br /> Project 4212493 Page No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.