My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-152 Resolution Accepting Johnson Controls, Inc. Change Order #1 Related to the Original Johnson Controls, Inc. HVAC Modifications to the Decatur Public Library
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-152 Resolution Accepting Johnson Controls, Inc. Change Order #1 Related to the Original Johnson Controls, Inc. HVAC Modifications to the Decatur Public Library
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 4:07:52 PM
Creation date
9/20/2022 4:07:50 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-152
Res Ord Title
R2022-152 Resolution Accepting Johnson Controls, Inc. Change Order #1 Related to the Original Johnson Controls, Inc. HVAC Modifications to the Decatur Public Library
Department
City Manager
Approved Date
9/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Cost $71,131 <br /> • Turnkey delivery for the above scope of work. <br /> • Project would be completed as an addition to the current performance contract <br /> • No change orders <br /> • Includes engineering, project management <br /> • Provide and revalidate control sequences and operating parameters of the existing AHU <br /> ECM-2 Everside Health Section 2: <br /> Scope of Work <br /> 1) Provide VAV-RH Boxes to Mechanical Contractor for installation. VAV-RH Boxes to include factory <br /> installed controls. Includes VAV-11 through VAV-12. <br /> 2) Provide Vav Reheat Coil control valves to Mechanical Contractor for installation <br /> 3) Provide and install temperature Controls for two(2)VAV boxes,including new thermostats, <br /> transformers,controllers and associated low voltage wiring. <br /> 4) Install network bus to communicate all available points to the BAS including graphics. <br /> 5) Provide field time to assist air balancer for balancing of each VAV-RH box. <br /> 6) Provide startup and validation of all points <br /> Project Cost $18,547 <br /> • Turnkey delivery for the above scope of work. <br /> • Project would be completed as an addition to the current performance contract <br /> • No change orders <br /> • Includes engineering,project management <br /> • Provide and revalidate control sequences and operating parameters of the existing AHU <br /> Additional Notes <br /> Cost above includes all engineering, permits fees,delivery,labor and material,project management start <br /> up,commissioning and training. <br /> ®2022 Johnson Controls,Inc.—Do not copy(physically,electronically,or in any <br /> other media)without the express written permission of Johnson Controls,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.