My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-176 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Final Services for the Oakland and Grand Area Sewer Separation Project, City Project 2021-01
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-176 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Final Services for the Oakland and Grand Area Sewer Separation Project, City Project 2021-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 2:21:44 PM
Creation date
10/19/2022 3:53:38 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-176
Res Ord Title
R2022-176 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Final Services for the Oakland and Grand Area Sewer Separation Project, City Project 2021-01
Department
Public Works
Approved Date
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-1.5 Prepare Conceptual Design Report <br /> A-1.6 Refine existing OPCC <br /> Products: <br /> P-1.1 Conceptual Design Report with Conceptual Figures <br /> TASK 2—30% Design <br /> Objectives: Provide preliminary (30%) design documents including drawings, list of <br /> specifications, and opinion of probable construction costs for review and <br /> comment. <br /> Approach: Utilizing the information from the Conceptual Design Report and related <br /> discussions, AECOM will prepare plans, list of specifications, and the opinion of <br /> probable construction costs to the 30% design level. The work will generally <br /> include demolition, proposed utilities, and restoration for the separated sewers <br /> along with accessory structures. <br /> This 30% design submittal will include basic outline drawings for the extent of <br /> work noted above. No detail sheets are anticipated for this submittal. A listing of <br /> anticipated specification sections will be included with this submittal. <br /> The 30% design documents will include an AACE Class 3 opinion of probable <br /> construction costs. A 20% contingency will be used along with a 15% allowance <br /> for contractor overhead and profit. <br /> Input: <br /> 1-2.1 Conceptual Design Report <br /> Activities: <br /> A-2.1 30% completion of plans <br /> A-2.2 30% listing of specifications <br /> A-2.3 30% completion of opinion of probable construction costs <br /> Products: <br /> P-2.1 30% plans, list of specifications, and opinion of probable construction costs. <br /> TASK 3—90% DESIGN <br /> Objective: Provide 90% design documents including drawings, specifications, and opinion of <br /> probable construction costs for review and comment. <br /> Approach: Utilizing the latest plans and specifications along with the City's review <br /> comments, AECOM will complete plans and specifications to the 90% level. The <br /> 90% level will include drawings and specifications to a level of development that <br /> is essentially biddable. The opinion of probable construction costs will be an <br /> update to the 60% design estimate with an AACE Class 1 estimate using 10% <br /> 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.