My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-162 Resolution Approving Expenditure of City Funds for Implementation of Office 365 Exchange Online with Presidio Networked Solutions Group, LLC
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-162 Resolution Approving Expenditure of City Funds for Implementation of Office 365 Exchange Online with Presidio Networked Solutions Group, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 12:28:25 PM
Creation date
8/8/2023 12:28:23 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-162
Res Ord Title
R2023-162 Resolution Approving Expenditure of City Funds for Implementation of Office 365 Exchange Online with Presidio Networked Solutions Group, LLC
Department
Information Tech
Approved Date
7/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur IL <br /> SOW#: 1003521055304 SOW-1 P R E S I D 1 O" <br /> 3-Jun-2022 <br /> Office 365 Migration <br /> 3. ASSUMPTIONS <br /> Presidio makes the following assumptions in developing this Statement of Work.These assumptions serve as the <br /> foundation to which the project estimate, approach and timeline were developed. By signing this SOW, Client agrees <br /> that these assumptions are correct and valid.Any changes to the following assumptions must be processed using the <br /> Presidio Change Management Process and may impact the project duration and labor requirements. <br /> 3.1. General Assumptions <br /> The following project assumptions are made and will be verified as part of the engagement: <br /> 1. Client has read and agrees with all items contained or omitted within this Statement of Work. <br /> 2. This SoW supersedes any previous scope discussion or agreement including"Vision Deck" PowerPoint <br /> proposals, emails,or verbal communications. <br /> 3. All Presidio activities will take place during normal working hours(Monday through Friday,8:00 a.m.to <br /> 5:00 p.m.,excluding holidays)unless noted as"Off Hours"in this SOW. <br /> 4. Any items or tasks not explicitly listed as in-scope within this SOW are considered to be outside of the <br /> scope and not associated with this SOW and price. <br /> 5. If integration of the product is performed at a Presidio facility,then transfer of ownership(acceptance) <br /> occurs upon the receipt and integration of goods at Presidio,regardless of shipment,as manufacturers <br /> will not accept returns of opened products. <br /> 6. Presidio will not be held responsible for troubleshooting networks,applications and/or hardware if Client <br /> has no formal change management documented processes and policies <br /> 7. Presidio may engage subcontractors and third parties in performing a portion of this work. <br /> 8. Presidio will not make changes to the configuration of any network equipment after it has been installed <br /> and tested. <br /> 9. Some activities included in this project may be performed on Presidio's premises. <br /> 10. Not all features or functions of the installed system are included in the scope of this engagement <br /> 11. Presidio reserves the right to modify the approach outlined within this SoW if it does not alter the <br /> timeline or overall outcome of the engagement. <br /> 12. Presidio will configure the systems outlined within this Statement of Work,with a unique set of <br /> authentication credentials, unless otherwise provided by Client. Upon the completion of the <br /> engagement, Presidio will provide Client with all user names, passwords,and additional authentication <br /> information that were implemented during the engagement. Presidio strongly recommends that these <br /> credentials be changed upon the completion of the engagement. <br /> 13. All work will be performed remotely. Utilizing WebEx as a VPN solution is out of scope. If Presidio has <br /> no other option, Presidio will issue a Change order to add additional funds to the project to <br /> accommodate the use of WebEx as a VPN solution. <br /> 14. Hands-on configuration of Barracuda email security is not included in this scope of work. <br /> 15. Hands-on configuration of GFI archiving is not included in this scope of work. <br /> 3.2. Client Responsibilities <br /> The following items are listed as responsibilities of Client for this engagement. Client is responsible for <br /> performing the items and activities listed in this section or arranging for them to be performed by a third- <br /> party if appropriate. <br /> 1. Provide a single Client point of contact with the authority and the responsibility of issue resolution and <br /> the identification,coordination and scheduling of Client personnel to participate in the implementation of <br /> the SOW.Without a single Client point of contact, a Project Change Request may be required for the <br /> additional effort by Presidio. <br /> 2. Participate in any required design sessions or workshops. <br /> Confidential and Proprietary <br />
The URL can be used to link to this page
Your browser does not support the video tag.