My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 11:26:19 AM
Creation date
12/12/2023 11:08:41 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-261
Res Ord Title
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
Department
Public Works
Approved Date
12/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 10. It is very likely with truck traffic and equipment movement that the entire existing walk <br /> from MH 4 (station 7+00) to approximately 30 ft. east of MH 5 (station 9+25) will be <br /> damaged and need to be removed and replaced. Is it the intent of the documents to <br /> only pay for replacing the areas that are marked on the plans? <br /> Limits shown on contract are intended to represent the minimum requirement. <br /> Removal and replacement of additional sidewalk due to construction damage shall be <br /> done at no additional cost to the Owner. <br /> 11. Is the construction layout for the project provided by the City of Decatur or their <br /> designee? <br /> Refer to General conditions GC-3 for Owner/Contractor site layout requirements. <br /> 12. Is construction inspection and testing provided by the City of Decatur or their designee? <br />' Refer to General Conditions GC-11. Costs related to furnishing and testing of samples <br /> will be borne by the Contractor. Independent testing laboratories may be used provided <br />' they meet the approval of the City. <br /> 13. Will the park be closed to public use during construction of the storm sewer? <br /> ' Fairview Park will not be closed during construction. <br /> To comply with Section 01500-1.9/1.11 Security which states-A. Entry Control: <br /> 1. Restrict entrance of persons and vehicles into Project site and existing <br /> facilities. <br /> 2. Allow entrance only to authorized persons with proper identification. <br /> 3. Maintain log of workers and visitors to be available to City upon <br /> request. <br /> Do we need to install temporary fencing around the work area to keep park visitors <br /> from encroaching into the work area? <br /> ' Temporary fencing is anticipated and along with any other means of entry control shall <br /> be the responsibility of the Contractor. <br /> ' 14. Section 02924/3.8 Watering A states—"The Contractor is required to maintain all <br /> seeded areas for a minimum of 1-year after topsoil and seeding restoration, including all <br /> necessary watering. Damaged areas that have not regrown to the satisfaction of the City <br /> of Decatur after 1-year shall be repaired by the Contractor at no additional cost to <br /> contract. The repair work shall include new topsoil, seeding, temporary erosion control, <br />
The URL can be used to link to this page
Your browser does not support the video tag.