My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 11:26:19 AM
Creation date
12/12/2023 11:08:41 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-261
Res Ord Title
R2023-261 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A & R Mechanical Services, Inc. DBA A & R Services, Inc. for the Oakland and Grand Area Sewer Separation Project-Fairview Park Storm Sewer, City Project 2021-01
Department
Public Works
Approved Date
12/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
watering, and fertilizing, all as required to restore the area to its original condition.:"To <br /> maintain seeding, including watering,for a year is a guess and cost is not <br /> determinable. Would you consider adding an item for an allowance for this, so that all <br /> bidders are bidding the same scope rather than guessing what is required? <br /> SNo change in this requirement is anticipated. Please prepare your bid accordingly. <br /> 15. Is trench backfill only required under paved and structural areas or is it the intent to use <br /> trench backfill on the whole 900 LF. 2000 CY is a lot of material. <br /> ' Granular backfill limits will be clarified in Addendum 42 to be limited top�p� g i in from <br /> approximately station 6+50 to 9+25. <br />
The URL can be used to link to this page
Your browser does not support the video tag.