Laserfiche WebLink
CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> FOR <br /> PORTLAND CEMENT CONCRETE <br /> Load Delivery Fee (Less than 2 CY.) and Load Delivery Fee (2 CY. to 6 CY.)will be <br /> measured at the contract unit price for each (EA). No measurement will be made for <br /> an order of more than five (5) cubic yards of the same concrete class to one work site in <br /> the same workday. No measurement will be made for a partial load required to <br /> complete an order of five (5) or more cubic yards of the same concrete class to one <br /> work site in the same workday unless it is the result of a reorder by the City. No <br /> measurement will be made in excess of six (6)to complete a multiple order totaling <br /> fifteen cubic yards or less of the same concrete class in the same workday. <br /> Calcium Chloride and Retarder will be measured for payment in cubic yards - percent <br /> (CYP). A GYP is equal to one cubic yard of concrete with one percent, by weight, of the <br /> admixture material (e.g. A concrete mix having an admixture of 1 percent Calcium <br /> Chloride will be paid for as 1 CYP per actual cubic yard of mix, a concrete mix having <br /> an admixture of 2 percent Calcium Chloride will,be paid for as 2 CYP per actual cubic <br /> yard of mix). <br /> Portland Cement will be measured as a separate item for payment per bag (94 pounds <br /> per bag) when additional Portland cement is added to a concrete mix at the direction of <br /> the City's representative. <br /> Dye will be measured for payment per pound of dye used. <br /> BASIS OF PAYMENT: <br /> Class PV Concrete (6 Bag), Class PV Concrete (6.5 Bag), Class PP Concrete (6.5 <br /> Bag), Class PP Concrete (7 Bag) and Controlled Low-Strength Material (CLSM) <br /> will be paid for at the contract unit price per cubic yard (CY) of the specified material. <br /> Said unit price shall include the material and all costs to mix, deliver and unload the <br /> concrete to any location within the corporate limits of the City of Decatur as directed by <br /> the City's representative. <br /> Load Delivery Fee (Less than 2 CY.) and Load Delivery Fee (2 CY. to 5 CY.) will be <br /> paid for at the contract unit price of each (EA). Said unit price shall include all costs to <br /> deliver and unload the concrete to any location within the corporate limits of the City of <br /> Decatur as directed by the City's representative. No payment will be made for an order <br /> of more than five (5) cubic yards of the same concrete class to one work site in the <br /> same workday. No payment will be made for a partial load required to complete an <br /> order of five (5) or more cubic yards of the same concrete class to one work site in the <br /> same workday unless it is the result of a reorder by the City. No payment will be made <br /> in excess of six (6)to complete a multiple order totaling fifteen cubic yards or less of the <br /> same concrete class in the same workday. <br /> 3 <br />