Laserfiche WebLink
'pFn <br /> 41,__t_4)79 Guidepost <br /> Cost of Treatments <br /> shows a cost range for the proposed measures as they appear in the report. Costs are based on past projects <br /> completed by the project team, the design treatment estimating guidelines from New Jersey Safe Routes' , and the <br /> Pedestrian Safety Guide and Countermeasure Selection System published by the Federal Highway Administration.The <br /> estimating guidelines were last updated in May 2022. Therefore,there may be some differences in cost. In addition, <br /> many factors go into the cost of construction projects, and it is not practical to give an exact price without fully <br /> designing the reconstruction. Factors, such as drainage issues, utility relocations, and right-of-way acquisition, can <br /> drastically change the pricing of projects. The following prices are for reference only and are best used to compare <br /> the countermeasures to each other and for high level budgeting purposes. <br /> Table 6 — Cost Ranges for Countermeasures <br /> Installed Installed Cost <br /> Type of Countermeasure Typical Size/Pricing Unit Cost Low High Range <br /> Range <br /> Raised Pedestrian Crossings Each $10,000 $30,000 <br /> Speed Cushion Each $8,000 $10,000 <br /> Pedestrian Refuge Island 6'Wide and 10'Long $4,000 $7,000 <br /> High Visibility Crosswalk Linear Feet $4 $8 <br /> Regulatory Warning Signs Each $200 $600 <br /> Flashing Beacon/Enhanced Warning Sign Each $13,000 $18,000 <br /> Pedestrian Scale Lighting Each $5,000 $8,000 <br /> (12'Tall,Installed Every 50') <br /> Pedestrian Crossing In-Roadway Illumination System Each $50,000 $80,000 <br /> Rectangular Rapid Flashing Beacon Each $10,000 $15,000 <br /> Addition of Pedestrian Signal Heads and Push Buttons to an 1 Intersection, 8 Signal Heads $30,000 $50,000 <br /> Existing Traffic Signal System and 8 Push Buttons <br /> Neckdowns(No Drainage Modifications) Each $8,000 $12,000 <br /> Curb Extension(Simple- No Drainage Modifications) 6'Wide,20'Long $6,000 $10,000 <br /> Curb Extension (Complex - Drainage Modifications Required) 6'Wide,20'Long $20,000 $30,000 <br /> Concrete Sidewalk Linear Feet $75 $200 <br /> Asphaltic Shared Use Path Linear Feet $150 $400 <br /> Chicane Each $30,000 $45,000 <br /> Marked Shoulder Road Narrowing Linear Feet $0.20 $1 <br /> Complete Pavement Marking Redesign for Road Narrowing Linear Feet $1 $8 <br /> (Lane Number Change,Addition of Parking,etc.) <br /> Complex Road Narrowing (Medians, Sidewalk Widening, Linear Feet $10 $20 <br /> Landscaping,etc.) <br /> Mini Roundabout Each $40,000 $60,000 <br /> Installation of Traffic Control Sign Each $500 $700 <br /> (Stop or Yield Sign) <br /> New Traffic Signal System with Countdown Pedestrian Signal Each $300,000 $500,000 <br /> Heads <br /> Replacing Signal Head Each $1,000 $2,500 <br /> High Friction Surface Treatment Square Yards $30 $120 <br /> 17 NJDOT Transportation Alternatives Program 2022 Cost Estimate Guidelines and Recommendations for Pedestrian,Bicycle and <br /> Traffic Calming Projects. Safe Routes New Jersey. May 2022. https://www.saferoutesnj.org/wp- <br /> content/uploads/2022/05/Design-Treatment-Estimating-Guidelines.pdf <br /> Kapur Page 46 of 81 <br />