My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-79 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc. for 2026 Local Motor Fuel Tax Street Improvement Project, City Project 2026-25
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-79 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc. for 2026 Local Motor Fuel Tax Street Improvement Project, City Project 2026-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2026 9:07:42 AM
Creation date
4/24/2026 2:55:09 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-79
Res Ord Title
R2026-79 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc. for 2026 Local Motor Fuel Tax Street Improvement Project, City Project 2026-25
Department
Public Works
Approved Date
4/6/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramps <br /> enton Dr Greenridge Karen Dr 1,745 0.66 75 Local Road Patch & Mill <br /> Dr & Overlay <br /> I'arry Dr Columbus Dr Karen Dr 755 0.29 75 Local Road Patch& Mill <br /> & Overlay <br /> olumbus Dr MacArthur Greenridge 1,065 0.40 75 Local Road Patch& Mill <br /> Rd Dr & Overlay <br /> . Hickory RR ROW Sawyer Rd 3.910 1.48 2,100 Major A-2 Sealcoat <br /> oint Rd Collector <br /> I . Grand Ave Lowber St 22nd St 3,557 1.35 5.850 Minor Arterial Patch, M & O. <br /> & Ramps <br /> . Marcella Dr Acorn Dr Wood St 531 0.20 200 Local Road Patch& Mill <br /> & Overlay <br /> S. Acorn Dr Wood St Main St 519 0.20 400 Local Road Patch & Mill <br /> & Overlay <br /> E. Wood St Acorn Dr 29th St 522 0.20 400 Local Road Patch& Mill <br /> & Overlay <br /> S. Linden Ave Wood St Main St 531 0.20 325 Local Road Mill & <br /> Overlay& <br /> Ramps <br /> 1E. Orchard St 34th PI Albany St 1.007 0.38 1.150 Local Road Patch & Mill <br /> & Overlay <br /> S. Albany St Orchard St Fulton Ave 1,929 0.73 1,050 Local Road Patch& Mill <br /> & Overlay <br /> Ridgedale Dr Phillips Dr Ridge Lane 1,111 0.42 200 Local Road Patch & Mill <br /> Dr & Overlay <br /> Ridge Lane Dr Phillips Dr Bay Shore 1.723 0.65 500 Local Road Patch& Mill <br /> Dr & Overlay <br /> Ridgeway Dr Phillips Dr Ridge Lane 1,339 0.51 300 Local Road Patch & Mill <br /> Dr & Overlay <br /> GHighland Rd Southland Rd Turpin Rd 1,277 0.48 225 Local Road A-1 Sealcoat <br /> Monroe St 1275 S Dead End 565 0.21 30 Local Road A-2 Sealcoat <br /> Monroe <br /> Mesa Dr Turpin Rd Tempe Dr 1.143 0.43 100 Local Road Patch & A-1 <br /> Sealcoat <br /> Tempe Dr Mesa Dr Turpin Rd 930 0.35 100 Local Road Patch & A-1 <br /> Sealcoat <br /> ilac Dr Turpin Rd Dead End 530 0.20 30 Local Road Patch & A-1 <br /> Sealcoat <br /> Total 26,391 10.00 <br /> Note: These locations can also be found on the map linked in this memo. <br /> In addition to paving these streets, sidewalk ramps, street curb, and some water services will be <br /> replaced. Utilities will also be adjusted. Crosswalks and stop bars will be refreshed downtown and around <br /> Millikin University. <br /> Letting Results <br /> The project scope and specifications were prepared by the Engineering Division. The project was advertised on <br /> February 25. 2026, and bids were opened on March 18, 2026. The results of the letting are as follows (bid <br /> tabulation attached): <br />
The URL can be used to link to this page
Your browser does not support the video tag.