Laserfiche WebLink
Exhibit A.1 <br /> 13. This Agreement does not include a Geotechnical survey. If it is deemed necessary,the City will <br /> provide that information as part of a separate agreement. <br /> 14. This Agreement does not include televising for sewer service laterals or design for sewer lining. <br /> 15. This Agreement does not include roadway typical section studies or pavement design studies. <br /> Existing and proposed typical section elements, including pavement cores and proposed <br /> pavement sections,will be provided by the City. <br /> 16. This Agreement does not include traffic data collection or traffic forecasting. <br /> 17. This Agreement does not include roadway lighting design. <br /> 18. This Agreement does not include utility potholing or potholing/subsurface investigation to locate <br /> or verify existing service lines. It is assumed that the City will contract these services <br /> independently,if needed. <br /> 19. This Agreement does not include construction engineering services. Construction engineering <br /> services will be provided by a subsequent Agreement. <br /> 20. This Agreement assumes that one bid package will be prepared for all water main installation, <br /> spanning multiple areas within the Census Tract 3. It is assumed to be approximately 2,000 If of <br /> new water main installation. It is assumed that two bid packages will be prepared for the service <br /> line replacements. <br /> 21. This Agreement assumes that City Standard details will be utilized when and where applicable. <br /> Clark Dietz will develop project specific details as required. <br /> 22. This Agreement assumes that existing City Right Of Entry(ROE)forms will be utilized. If <br /> modifications need to be made based upon project specific needs,City will make those changes, <br /> and their legal department will review prior to distribution. <br /> 23. This Agreement assumes that one(1)public meeting will be held for each Galvanized Water <br /> Service Replacement project bid package. (Total of 2 meetings) <br /> 24. This Agreement assumes that the existing dashboards already created by the City will be utilized. <br /> The existing dashboards will be updated on a monthly basis. If existing dashboards can not be <br /> utilized, building new dashboards is not included in this scope of work. <br /> 25. This Agreement assumes that the existing data management system currently used by the City <br /> will be utilized. Clark Dietz will coordinate with the City to incorporate data from this year's <br /> project into their existing system. This agreement does not include evaluation or transitioning to a <br /> different data management system. <br /> 26. This Agreement includes preparing the IEPA SRF Engineering design checklist and bidding <br /> checklist, as well as other required loan document preparation. It is assumed that financial <br /> documents will be provided by the City. <br /> A-4 <br />