My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-78 APPROPRIATE MOTOR FUEL TAX FUNDS
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-78 APPROPRIATE MOTOR FUEL TAX FUNDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2015 3:18:48 PM
Creation date
7/21/2015 10:18:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-78
Res Ord Title
APPROPRIATE MOTOR FUEL TAX FUNDS FOR RESTORATION OF STREETS & HIGHWAYS
Department
Public Works
Approved Date
6/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pavement has failed. Reconstruction generally involves the full removal of the pavement, <br /> stabilizing the base material with cement, and then relaying an asphalt surface. Arbor Drive will <br /> be constructed in multiple stages to maintain one-way traffic during the duration of <br /> reconstruction work. The City and the contractor performing the work will be in contact with the <br /> residents along this stretch of Arbor Drive. In total, 3.34 lane miles of the City's 825 total lane <br /> miles will be rehabilitated as part of this project. <br /> The annual paving projects generally include a significant amount of patching to repair failed <br /> street sections that are becoming more prevalent throughout the City as capital improvement <br /> funds devoted to pavement maintenance are reduced. This year crack sealing will also be <br /> included to help some of the newer streets last longer. <br /> The proposed street list for Street Restoration is as follows (see attached location maps): <br /> Street Begin End Surface Treatment Length (feet) Length <br /> Lane Miles <br /> Arbor Drive Oakland Ave MacArthur Road Cement Stabilization 2,570 0.97 <br /> with Hot Mix Asphalt <br /> Mound Road MacArthur East of Greenridge Mill and Overlay 1,150 0.87 <br /> Road Drive <br /> South Side of <br /> Franklin Intersection Eldorado Street Mill and Overlay 1,979 1.50 <br /> Street w/Wood <br /> Street <br /> Total Length 5,699 3.34 <br /> The proposed locations for patching as part of the Street Restoration project are as follows: <br /> Quantity <br /> Street Location (Square <br /> Feet <br /> W.Arbor Drive West of Oakland Av. 1,845 <br /> N.Mission Drive At intersection with Arbor Dr. 234 <br /> E.Hickory Point Road In section with oil&chip surface 5,469 <br /> E. Wood Street Between Jasper and US 36 15,111 <br /> N MacArthur Road Concrete patches north of Pershing Rd. 4,298 <br /> Total Quantity 26,957 <br /> Proposed 2015 Micro-surfacing Project <br /> The resolution appropriates $140,000 in MFT funds for micro-surfacing work for the proposed <br /> 2015 Micro-surfacing project, City Project 2015-24. The Micro-surfacing project is focused on <br /> protecting pavements with moderate deterioration from further damage. The actions of sun, <br /> freezing, traffic and age all combine to deteriorate pavement. Micro-surfacing is designed to seal <br /> and protect the pavement surface and slow deterioration thereby delaying the need of more <br /> expensive treatments such as a mill and overlay or reconstruction. The work involves coating the <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.