Laserfiche WebLink
1 <br /> � f <br /> Exhibit A <br /> 1. Identify areas where sanitary sewer service may not be feasible or is cost prohibitive. <br /> 2. Prepare program level cost estimates to provide sanitary sewer service to unserved areas. <br /> Task 11000—Storm Water Drainage Analysis <br /> A storm water drainage analysis will be performed. Information obtained during the transportation <br /> study phase will be used to perform the following: <br /> 1. Explore the potential for creating regional storm water detention facilities to serve multiple <br /> developments. <br /> 2. Prepare program level cost estimates to construct identified improvements. <br /> Task 12000—Identify Potential Funding Sources <br /> A program funding analysis will include the following tasks: <br /> 1. Prioritize and schedule a series of useable segments over a defined time period. <br /> 2. Identify potential funding sources and strategies for state,federal, local and private funding. <br /> 3. Create a brochure that articulates a potential method of funding the Capital Program <br /> Task 12500—Prepare Draft and Final Report—CIP <br /> A report will be prepared for submittal to the City of Decatur that will summarize the Capital <br /> Improvement Plan.The report will not include all of the environmental studies that would be necessary <br /> to process as a Categorical Exclusion (CE)and prepare a Project Development Report for submittal to <br /> IDOT.The report will include sections that may eventually be used in a Project Development Report. <br /> The report will include the following: <br /> 1. Description and location of the project. <br /> 2. Description of the existing facility. <br /> a. Traffic Data <br /> b. Existing structures <br /> c. Existing railroads <br /> d. Existing utilities <br /> 3. Description of existing typical sections at each end of the proposed improvement. <br /> 4. Description of proposed improvement. <br /> a. Purpose and need <br /> b. Design guidelines <br /> c. Functional classification <br /> d. Regulatory or posted speed limit <br /> e. Work to be accomplished by proposed improvement <br /> f. Items affecting improvement (hazardous mailbox supports, parking,truck restrictions, <br /> mail delivery) <br /> A-12 <br />