Laserfiche WebLink
Exhibit A <br /> C. FINAL REPORT all DELIVERABLES <br /> MANHOLE INVESTIGATION, INSPECTION&ASSESSMENT REPORT <br /> 1. The final deliverable will consist of an SSRI Geodatabase containing NASSCO MACP <br /> and PACP-compliant attributes. A compilation of standard NASSCO forms for <br /> individual sewer manholes. Collectively,the video and MACP/PACP reports will be <br /> used to perform a conditional assessment of each sewer manhole and this data will <br /> be reported to the City. <br /> a. All dimensions of the manhole <br /> b. All sewer line tie-ins and sizes <br /> c. Direction of flow/depth <br /> d. Depth and type of debris <br /> e. Location and type of defects <br /> f. Environmental conditions,water and atmosphere temperatures <br /> g. Evaluation of existing conditions found <br /> h. Video of the MH in MPEG format <br /> D. ASSUMPTIONS/CONDITIONS <br /> This Agreement is subject to the following assumptions/conditions: <br /> SCHEDULE <br /> It is anticipated that the Manhole Inspection survey will take place from September 14 <br /> through December 2015. The prices in this contract will be applicable through December <br /> 2015, <br /> E. ACCEPTANCE OF CONDITIONS STATEMENT <br /> Tele Scan, Inc. hereby affirms that they are in full acceptance of all conditions and <br /> requirements and are prepared to execute an agreement with the City of Decatur and <br /> perform these services accordingly. <br /> 1. The work shall be performed in compliance with applicable OSHA requirements. <br /> 2. All insurance requirements shall be met. <br /> F. SUBCONTRACTORS <br /> Tele Scan, Inc. plans to perform all the services required in this proposal. <br /> --+A-3 <br />