Laserfiche WebLink
SPECIAL PROVISIONS <br /> SP-4 TRAFFIC CONTROL <br /> Description: Traffic control shall be in accordance with the applicable sections , <br /> of the Standard Specifications for Road and Bridge Construction,the applicable <br /> guidelines contained in the Illinois Manual on Uniform Traffic Devices for Streets and <br /> Highways,these Standard Specifications, and any special details and Highway Standards <br /> contained herein and in the plans. <br /> Special attention is called to Articles 107.09 and 107.14 and Sections 701, 702, ' <br /> and 703 of the Standard Specifications for Road and Bridge Construction and the <br /> following highway standards relating to traffic control: <br /> It is the intent of the City that all streets under this project shall be kept open to <br /> traffic at all times unless permission is obtained from the Engineer to close said lane <br /> and/or street. In the event that it is necessary to close the lane and/or street,the Engineer <br /> shall be consulted to obtain permission at least 48 working hours in advance of the <br /> proposed lane and/or street closing. All appropriate lane closure permits shall be filed <br /> with the Public Works Department prior to any street/lane closures. In addition, at ' <br /> the end of every work day the lane and/or street shall be opened to local traffic unless <br /> approved by the Engineer. <br /> Star Route Road will only be fully closed to abutting property owners for one 24- <br /> hour period to allow the cement modified soil to cure. Otherwise adjacent property <br /> owners will be allowed access to their driveways. The full road closure will avoid ' <br /> Wednesday to allow access for garbage pickup. <br /> Basis of Payment: All labor and materials necessary to comply with this special <br /> provision will not be paid for separately but will be considered included in the various <br /> pay items requiring traffic control and no additional compensation will be paid. <br /> SP-5 COOPERATION AND CONTROL OF WORK <br /> In addition to the requirements of Section 105,the Contractor shall make every <br /> effort to communicate their schedule and proposed construction activities to affected <br /> property owners on a regular basis. The Contractor shall identify a single person, on the ' <br /> work site at all times,to act as the liaison between property owners,residents,the City <br /> and the Contractor. This person shall have full authority from the Contractor to negotiate <br /> access matters with all parties and shall meet the approval of the City and the Township. <br /> The Contractor's liaison shall meet with residents affected by the work regularly to keep ' <br /> them updated on the actual construction progress. The Contractor shall work with <br /> residents to allow access as much as possible and shall work to keep them fully informed <br /> of the schedule of work. ' <br /> The City shall have the authority to require the Contractor to replace this liaison <br /> should the City be dissatisfied with their performance for any reason. If required by the <br /> City,the Contractor shall designate a new liaison, meeting the approval of the City, <br /> within a 24 hour period of receiving written notice. <br /> 42 <br />