Laserfiche WebLink
FAP 712 (IL 105) <br /> Section: 128RS RS-4, (48K) RS-2 <br /> Macon County <br /> Contract No.: 74475 <br /> Job Number: C-97-117-10 <br /> Agreement No.: JN 714-004 <br /> This agreement entered into this 19th day of May , A.D., 2014, by and between the <br /> STATE OF ILLINOIS, acting by and through its DEPARTMENT OF TRANSPORTATION <br /> hereinafter called the STATE, and the CITY of DECATUR, in Macon County, of the State of <br /> Illinois, hereinafter called the CITY. <br /> WITNESSETH: <br /> WHEREAS, the STATE in order to facilitate the free flow of traffic and insure safety to <br /> the motoring public, is desirous of improving approximately 3.85 miles (20,343 feet) IL 105 (FAP <br /> Route 712, State Section 128RS RS-4, (48K) RS-2 CITY Section 04-00401-00-TL ) from US 36 <br /> to Busn 51 in the City of Decatur by milling and resurfacing the existing driving lanes and <br /> approaches, removing and replacing sidewalk curb ramps at Prairie, Main, Wood, Clay, <br /> Hendrix, Lawrence, Lost Bridge and Jasper Streets. and upgrading traffic signals at Prairie, <br /> Wood, Jasper, Riverside, and Lost Bridge and by performing all other work necessary to <br /> complete the improvement in accordance with the approved plans and specifications under <br /> stage construction and without change to the existing pavement widths or additional right of way <br /> and; and <br /> WHEREAS, the CITY is desirous of said improvement in that same will be of immediate <br /> benefit to the CITY residents and permanent in nature; <br /> NOW, THEREFORE, in consideration of the mutual covenants contained herein, the <br /> parties hereto agree as follows: <br /> 1. The STATE agrees to make the surveys, obtain all necessary rights of way, prepare <br /> plans and specifications, receive bids and award the contract, furnish engineering <br /> inspection during construction and cause the improvement to be built in accordance with <br /> the plans, specifications and contract. <br />