Laserfiche WebLink
2. The STATE agrees to pay for all right-of-way, construction and engineering costs subject <br /> to reimbursement by the CITY, as hereinafter stipulated. <br /> 3. It is mutually agreed by and between the parties hereto that the estimated cost and cost <br /> proration for this improvement is as follows: <br /> STATE CITY TOTAL <br /> Type of Work Cost % Cost % Total <br /> All constr. costs $2,281,939 100 $0 0 $2,281,939 <br /> excluding the <br /> following <br /> Side Streets <br /> Mill and $0 0 $10,008 100 $10,008 <br /> resurface <br /> Resurface $28,865 50 $28,865 50 $57,730 <br /> approaches <br /> ADA <br /> Curb Ramps $68,913 80 $17,228 20 $86,141 <br /> Traffic Sienals <br /> Jasper/Southland $85,328 90 $9,481 10 $94,808 <br /> Lost Bridge $165,970 90 $18,441 10 $184,411 <br /> Rd/S 16th Street <br /> Special request $0 $1,400 100 $1,400 <br /> paint <br /> East Riverside $14,498 100 $0 0 $14,498 <br /> Avenue <br /> E Wood Street $30,100 90 $3,344 10 $33,444 <br /> E Prairie Street $23,058 90 $2,562 10 $25,620 <br /> MLK $4,275 100 VO 0 $4,275.00 <br /> Sub Total $2,702,945 $91,330 $2,790,000 <br /> P&C Engr. 15% $405,442 $13,699 $419,141 <br /> Total $3,108,387 $105,029 $3,213,416 <br /> Participation and reimbursement shall be predicated by the percentages shown above for <br /> the specified work. Cost shall be determined by multiplying the final quantities times <br /> contract unit prices plus 15% for construction and preliminary engineering. Participation <br /> toward the traffic signals shown above shall not exceed $ 50,641 which represents 125% of <br /> their estimated construction and engineering cost. <br /> 4. The CITY has passed a resolution appropriating sufficient funds to pay its share of the <br /> cost for this improvement using form BLR 0911 or the sample attached hereto as <br /> "Exhibit A" and made a part hereof. , <br />