My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-23 ACCEPTING THE BID AND AUTHORIZING A CONTRACT FOR 2014 ANNUAL WATER MAIN REPLACEMENT PROJECT
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-23 ACCEPTING THE BID AND AUTHORIZING A CONTRACT FOR 2014 ANNUAL WATER MAIN REPLACEMENT PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:02 AM
Creation date
7/30/2015 4:11:53 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-23
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR 2014 ANNUAL WATER MAIN REPLACEMENT PROJECT, SOUTH SIDE DRIVE / MEDIAL DRIVE
Department
Public Works
Approved Date
4/7/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P , <br /> Public Works Memorandum <br /> NO. 2014-09 <br /> DATE: March 26, 2014 <br /> TO: Honorable Mayor McElroy and City Council <br /> FROM: Ryan P. McCrady, City Manager <br /> Richard G. Marley, P.E., Public Works Director <br /> Keith D. Alexander, Director of Water Management <br /> SUBJECT: Annual Water Main Replacement Project, City Project 2014-10 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached resolution awarding the contract for the <br /> Annual Water Main Replacement Project, City Project 2014-10,to Entler Excavating Company, Inc., <br /> as the lowest, responsible bidder in the amount of$294,060.88, and that the Mayor be authorized to <br /> execute the contract, and the City Clerk to attest. <br /> PRIOR COUNCIL ACTION: <br /> The City Council approved the FY 2014 Capital Improvements Plan which included an allocation of <br /> funds for this project. The City allocates funds for a yearly water main replacement project. <br /> BACKGROUND: <br /> Project Description <br /> The City's Annual Water Main Replacement project targets water main segments throughout the City <br /> experiencing a high rate of main breaks or that require extensive repairs. The Water Management <br /> Department tracks each repair made and uses the compiled data to determine which water mains need <br /> to be replaced and then the list is prioritized to meet the available funding. <br /> This year's project proposes work at 2 locations on the south side of the City: <br /> Medial Drive and Route 51: Over the winter of 2012-13 a water main broke under Rt. 51 <br /> approximately 400' south of I"Drive. The 2013 Water Main Replacement Project abandoned this <br /> crossing and replaced a section of 12" water main on the east side of Rt. 51 as shown on the attached <br /> location map. Replacing the 12" main was the first phase of the overall work that must be completed <br /> to fully restore the water distribution system in the area. The second phase of the work is to bore a <br /> new main under Rt. 51 at Medial Drive to create a second connection to the neighborhood west of Rt. <br /> 51. This work is planned as part of the 2014 Water Main Replacement project. <br /> South Side Drive at Ward Branch: This portion of the 2014 Water Main Replacement project replaces <br /> a segment of 12" water main extending from Ward Branch west to Farm&Fleet as shown on the <br /> attached location map. This work will include directionally boring a new water main under Ward <br /> Branch and also bore a new main under South Side Drive. This segment of water main has had several <br /> breaks over the years including one in 2010 that destroyed a large section of South Side Drive. <br /> Page I 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.