Work on the project began in August, 2009. The project entailed replacing piers 3 and 6 of the <br /> Garfield Bridge over the CNIC Railroad tracks and performing deck repairs to the structure. <br /> Replacing the piers involved drilling micro-piles under each pier, shoring was installed under the <br /> bridge, the old piers were demolished and new piers were constructed. <br /> Appendix B provides a brief photographic overview of the project which began in August, 2009 and <br /> was substantially P ru�'Ycompleted in February, 2010. <br /> The project exceeded the allotted working days by 27 days and IDOT assessed $30,510 in liquidated <br /> damages against the contractor. Negotiations with the contractor over the liquidated damages <br /> h 1 <br /> stretched IDOT's acceptance of the final project closeout documents until May, 20 2. The final <br /> billing from IDOT for the City's share of construction costs was received on October 15, 2013. <br /> Additional Motor Fuel Tax Appropriation Required <br /> The final project cost was $1,202,688 which was $35,915 over the original awarded contract amount <br /> of$1,166,773. The primary cause of the added cost was the extensive deterioration of the steel <br /> girders that was found when the concrete that was encasing them was removed during the demolition <br /> of the structure as shown in the photographs labeled as Figure 5 and Figure 7 in Appendix B. Work <br /> to install additional bracing for the beams amounting to $53,574 was unforeseen and was ordered by <br /> IDOT. Bracing the beams was necessary to complete the project as designed and assure the stability <br /> of the structure. A large portion of the cost for added work was offset by the$30,510 liquidated <br /> damages assessment. <br /> At the outset of the project,the City authorized the expenditure of$380,000 in MFT funds to cover <br /> the City's share of the bridge project. An additional appropriation of$30,688.32 in MFT funds is <br /> required to pay the City's final invoice from IDOT. The additional amount of$30,688.32 added to <br /> the previously appropriated $380,000,brings the total MFT allocation for the Garfield Bridge project <br /> to $410,688.32. <br /> BUDGEUTIME IMPLICATIONS: <br /> Budget Impact: Funding for the additional appropriation of$30,688.32 in MFT funds is allocated in <br /> the Motor Fuel Tax fund. This is in addition to the previously approved amount of$380,000, for a <br /> total budgeted MFT allocation of$410,688.32. <br /> Staffing Impact: Staff time is allocated for this project closeout. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation <br /> STAFF REFERENCE: Richard Marley, Public Works Director, and Matt Newell, City Engineer. <br /> Richard Marley will be in attendance at the City Council meeting to answer any questions of the <br /> Council on this item. This Memorandum was prepared by Matthew C. Newell, P.E., City Engineer. <br /> Attach: 3 <br /> Page2 <br />