My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-92 AUTHORIZING EXECUTION OF CONTRACT - ARCHITECTURAL SERVICES
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-92 AUTHORIZING EXECUTION OF CONTRACT - ARCHITECTURAL SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 8:53:48 AM
Creation date
8/17/2015 8:53:48 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-92
Res Ord Title
AUTHORIZING EXECUTION OF CONTRACT - ARCHITECTURAL SERVICES - 707 SOUTHSIDE DRIVE - POLICE FACILITY
Approved Date
9/3/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structured Cabling <br /> 1. Standards compliant Category 6 horizontal cabling network <br /> 2. 50 micron multi mode fiber optic back bone. <br /> 3. Main distribution facility will also serve as server room. <br /> 4. Two intermediate distribution facilities on north end of building will also act as D-MOrk locations. <br /> 5. 4 post open frame racks <br /> 6. Minimum of two racks per closet <br /> 7. Owner to provide anticipate heat load for equipment being provided <br /> 8. Owner anticipates the new building being fed with fiber. (2) 144 strand cables configured as a ring system. Prefer <br /> two redundant entrance points into the building <br /> 9. CATV distribution will be required throughout the facility with drops in open offices, meeting/conference spaces, <br /> and designated private offices. TV's will be owner furnished. <br /> Audio/Visual <br /> 1. Basic Audio/Visual presentation systems comprised of a wall mount flat panel display and input connectivity will <br /> be required for Conference Room 123-1 and Meeting Room 126-1. <br /> 15. Presentation systems for Training 131-1/132-1 will be comprised of two stand alone systems that can be <br /> combined to function as one larger system. Systems will include fixed ceiling mount projectors, input <br /> connectivity,switching and processing, distributed overhead sound reinforcement system, and integrated control <br /> system. <br /> 16. Major Case Conference 167 presentation system will allow for simultaneous sharinglof multiple sources. Primary <br /> presentation system will be comprised of a fixed ceiling mount projector. Two additional wall mount flat panel <br /> displays will be included. Basic over head sound reinforcement, integrated control,and necessary input <br /> connectivity will be included. <br /> 17. ERT Briefing 148 presentation system will be comprised of a single fixed ceiling mount projector, input <br /> connectivity,switching and processing, and distributed overhead sound reinforcement. <br /> FURNITURE ACQUISITION PACKAGE <br /> Dewberry Architects Inc.shall provide interior design services related to the preparation of Furniture Acquisition Package <br /> for the Decatur Police Facility as follows: <br /> Schematic Phase/Information Gathering: <br /> 1. Determine User Group to represent the project areas <br /> 2. Review of floor plans,gather input from User Group for all areas of the building <br /> 3. Review adjacencies and User/department needs <br /> 4. Review public area needs and design intent <br /> 5. Review shared space needs and design intent <br /> 6. Determine sustainability needs and impacts on furniture selections <br /> 7. Meetings (2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.