My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 11:07:18 AM
Creation date
8/17/2015 11:07:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-74
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR LAKE DECATUR DAM REPAIRS PROJECT - PHASE II
Department
Public Works
Approved Date
7/15/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-4 CONTRACT WARRANTY <br /> The Contractor shall guarantee all materials and equipment furnished and work <br /> performed for a period of one (1) year from the date of substantial completion unless otherwise <br /> noted in the specifications. The Contractor warrants and guarantees for a period of one (1) year <br /> from the date of substantial completion of the system that the completed system is free from all <br /> defects due to faulty materials or workmanship and the Contractor shall promptly make such <br /> corrections as may be necessary by reason of such defects, including the repairs of any damage <br /> to other parts of the system resulting from such defects. The Owner will give notice of observed <br /> defects with reasonable promptness. In the event that the Contractor should fail to make such <br /> repairs, adjustments or other work that may be made necessary by such defects, the Owner may <br /> do so and charge the Contractor the cost thereby incurred. The Contract Bond shall remain in <br /> full force and effect through the guarantee period. <br /> GC-5 CONTRACTOR AVAILABILITY <br /> At all times when work is being performed (by Contractor himself or subcontractor), the <br /> prime Contractor shall have on the job site someone in their direct employ who is capable of <br /> meeting with the Engineer and making decisions. If authorized by the Engineer, this condition <br /> may be satisfied by having a telephone number or someone who satisfies the above <br /> requirements. <br /> GC-6 COORDINATION <br /> Cooperation between the Contractor, City and Property Owners is imperative. The <br /> responsibility and cost to maintain access is borne by the Contractor. For the purpose of this <br /> contract the term "Owner" and/or "Engineer" in the Contract Documents shall be interpreted as <br /> the appointed representative of the City of Decatur, Department of Public Works. <br /> GC-7 DUST CONTROL <br /> As a part of their construction obligation, the Contractor shall make every reasonable <br /> effort to control dust throughout the construction area. Dirt, sand or other materials scattered <br /> over traveled areas shall be disposed of by sweeping, flushing or other appropriate measure. <br /> Temporary surfacing shall be continually maintained to avoid loose materials or dust pockets. <br /> GC-8 EASEMENTS AND PERMISSION FOR ENTRY <br /> Not Applicable <br /> GC-9 ESTIMATED QUANTITIES AND LOCATION CHANGES <br /> The quantities for this fob are estimates only. These estimated quantities are used for <br /> establishing unit prices. The City reserves the right to increase, decrease, or omit any of the <br /> estimated quantities in this project. No additional compensation will be allowed for these <br /> changes. <br /> Also see Technical Specification Section 012200. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.