wiring was complete, the existing generator still would not be large enough to support full <br /> function of all operations housed in the MSC building. <br /> To correct this problem, staff investigated the cost of replacing the existing generator with one <br /> large enough to support all the emergency response functions in the MSC building during an <br /> extended power outage. Considering the age of the existing emergency generator,this option <br /> appeared to be the best choice. <br /> The City's recent financial constraints presented a barrier that prevented moving ahead with the <br /> generator replacement project. A funding solution was found when staff reviewed the utilization <br /> of existing equipment and realized that the 2008 Caterpillar 12M Motor Grader was <br /> underutilized having only 1,148 hours of run time. This unit of equipment was originally <br /> acquired for grading and shaping roads and alleys. In recent years, an alley grader box <br /> attachment for one of the City's tractors was acquired to grade and shape alleys. The grader box <br /> is faster, produces better results and costs far less than a motor grader. The motor grader was <br /> purchased with a"buy-back"provision with a guaranteed resale price of$110,000. The motor <br /> grader was offered for sale on GovDeals.com. The highest bid received was for$125,500, which <br /> was accepted. <br /> Project Description <br /> The Decatur Municipal Services Center Generator Replacement project consists of replacing a <br /> 75 KW generator and 200 amp transfer switch with a new 250 KW generator and 1,000 amp <br /> transfer switch. The City will retain ownership of the existing generator. When the project is <br /> complete, it will be sold at auction. <br /> The project scope and specifications were prepared by Architectural Expressions, LLP, with <br /> three alternate bids. The project was advertised on May 15 and 22, 2013, and bids were opened <br /> on May 29, 2013. The results of the letting are as follows (bid tabulation attached): <br /> Alternate 1 Alternate 2 Alternate 3 <br /> Bidder <br /> %Over/Under %Over/Under %Over/Under <br /> Eng.Estimate Ene.Estimate Ene.Estimate <br /> Anderson Electric, Inc. <br /> $67,970.00 $127,650.00 $61,680.00 <br /> 11.73% 0 0 <br /> (- ) (-16.87/o) (-21.49/o) <br /> Cummins Crosspoint $66,600.00 NO BID NO BID <br /> (-13.51%) <br /> Bodine Electric $68,150.00 $130,725.00 $64,575.00 <br /> (-11.49%) (-14.87%) (-17.80%) <br /> Alpha Electric of Decatur $68,992.00 $129,499.00 $62,507.00 <br /> (40.40%) (-15.67%) (20.43%) <br /> $69,177.00 $137,777.00 $70,277.00 <br /> Pal's Electric, Inc. (40.16%) (-10.28%) (-10.54%) <br /> WHE, Ltd NO BID NO BID NO BID <br /> Engineer's Estimate $77,000.00 $153,560.00 $78,560.00 <br /> Page 2 <br />