My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-91 ACCEPTING THE BID AND AUTHORIZING A CONTRACT FOR BRIDGE REPAIRS PROJECT
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-91 ACCEPTING THE BID AND AUTHORIZING A CONTRACT FOR BRIDGE REPAIRS PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 10:20:56 AM
Creation date
8/21/2015 10:20:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-91
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR BRIDGE REPAIRS PROJECT, COUNTRY CLUB BRIDGE OVER LAKE DECATUR / GARFIELD AVENUE BRIDGE OVER 22ND STREET
Department
Public Works
Approved Date
4/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Country Club Bridge over Lake Decatur <br /> The most recent inspection determined that significant corrosion was present at the south ends of <br /> the two outside beams. Follow-up inspections were also performed by the Illinois Department of <br /> Transportation(IDOT) to determine if load restrictions were necessary. IDOT requested that <br /> temporary shoring be placed under the bridge until repairs could be made. The project will <br /> install metal plates to strengthen the corroded beams thereby restoring full capacity to the <br /> structure. The repairs will require Country Club Road to be closed for approximately 2 weeks. <br /> Garfield Bridge over 22nd Street <br /> An inspection in 2010 recommended that the following repairs be completed: <br /> 1. Repair erosion on the northwest corner of the structure near the abutment. <br /> 2. Replace the failed slope wall on the west side of the structure. <br /> 3. Replace a portion of the concrete deck near the east side of the bridge that had <br /> deteriorated. <br /> This project will address item 3 by replacing a deteriorated section of the bridge deck. City <br /> crews will perform the erosion repairs identified as item 1. Item 2 will be deferred to a future <br /> project that will replace the entire deck currently planned to be completed in 5 years. <br /> Bid Results <br /> The project scope and specifications were prepared by Homer L. Chastain & Associates, LLP <br /> and approved by City staff and the Illinois Department of Transportation (IDOT) for the use of <br /> Motor Fuel Tax funds. The project was advertised on March 21, and 28, 2012, in the Decatur <br /> Tribune and March 22, and 29, 2012 by IDOT and bids were opened on April 5, 2012. The <br /> results of the letting are as follows (bid tabulation attached): <br /> Compared to <br /> Engineer's <br /> Bidder Bid Price Est.Over(-Under) <br /> Halverson Construction Company, Inc. $48,105.00 58.37% <br /> Illinois Valley Paving, a Division of United Contractors $77,710.90 155.84% <br /> Midwest, Inc. <br /> Engineer's Estimate $30,375.00 -------- <br /> Halverson Construction Company, Inc. provided the low bid and has successfully completed <br /> other projects of this type for the City. The low bid amount is significantly higher than the <br /> engineer's estimate, generally due to the low volume of work and the complexity of the repairs <br /> needed on the Country Club Bridge. The outer beams of the bridge are currently supported by <br /> temporary timbers and the repair will require working around the varying level of the lake. It is <br /> likely that rebidding the project will not result in a better price for the work. A letter of <br /> recommendation from Homer L. Chastain & Associates, LLP is attached. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.