My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-140 AUTHORIZING AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-140 AUTHORIZING AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2015 8:26:42 AM
Creation date
10/7/2015 8:26:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-140
Res Ord Title
AUTHORIZING AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES FOR BRUSH COLLEGE ROAD SUBWAY STUDY
Department
Public Works
Approved Date
7/6/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Task 00900—Prenaration of Studv Report <br /> URS will perfarm the following tasks: <br /> 1. Prepare narrative describing existing conditions and options considered. <br /> 2. Prepare exhibits <br /> 3. Document existing level of service <br /> 4. Document design criteria based on traffic data <br /> 5. Prepare a comparison summary of all options considered(including "Do Nothing"j <br /> A. Compare preliminary cost estimate <br /> B. Compare property impacts <br /> C. Compare maintenance of traffic issues <br /> D. Compare environmental impacts <br /> E. Compare other issues <br /> 6. Describe recommendation and preferred option. <br /> 7. Assemble document and issue for review <br /> 8. Incorporate review comments and issue study report <br /> Task 01000—Prenare Proiect Development Renort <br /> The following will be performed as part of the preparation of a Categorical Exclusion Project Development <br /> Report: <br /> 1. Prepare text far the report including the following anticipated sections: <br /> A. Location and existing conditions <br /> B. Proposed improvement <br /> C. Crash Analysis <br /> D. Right-of-Way <br /> E. Floodplain Encroachment <br /> F. Phase 1 &2 NPDES Storm Water Permit Requirements <br /> G. USACOE Section 404 Permit <br /> H. Special Waste <br /> I. Environmental Survey <br /> 7. Section 4(�Land <br /> K. Air Quality <br /> L. Noise Analysis <br /> M. Maintenance of Traffic <br /> N. Public Involvement <br /> O. Coordination: LA-IDOT-FHWA <br /> Scope 6-4-10 A-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.