My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-140 AUTHORIZING AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-140 AUTHORIZING AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2015 8:26:42 AM
Creation date
10/7/2015 8:26:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-140
Res Ord Title
AUTHORIZING AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES FOR BRUSH COLLEGE ROAD SUBWAY STUDY
Department
Public Works
Approved Date
7/6/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> P. Other Coordination <br /> Q. Summary of Commitments <br /> R. Prepare the following exhibits for inclusion in the report: <br /> i. Vicinity Map <br /> ii. Location Map <br /> iii. Existing Typical Sections <br /> iv. Proposed Typical Sections <br /> v. Aerial Map <br /> vi. Proposed Plan&Profile <br /> vii. Preliminary Cost Estimate <br /> viii. Floodplain Maps <br /> ix. Wetland Maps <br /> S. Prepare Coordination Correspondence including IDOT/FHWA Coordination Meeting <br /> Minutes,Environmental Correspondence,Utility Coordination,Agency Coordination <br /> Meetings, Stakeholders Meetings <br /> T. Attend IDOT review meetings. <br /> Task 01050—Prenare TS&L and SGR <br /> The following tasks will be performed as part of the preparation of the TS&L and Structure Geotechnical <br /> Report(SGR): <br /> 1. Obtain structure and roadway soil borings for selected option. (SKS Engineers) <br /> 2. Prepare Structure Geotechnical Report(SGR)for the selected option. SGR will evaluate soils data <br /> and provide recommendations regarding foundations. <br /> 3. Prepare Type, Size and Location (TS&L)drawing for selected option. <br /> 4. Incorparate review comments and submit final TS&L and SGR. <br /> Task 02000—Proiect Mana�ement <br /> The following tasks will be performed as part of the project management for the project: <br /> 1. Prepare Wark Authorization Form(WAF) based on approved manhours and tasks. <br /> 2. Prepare project tracking spreadsheets. <br /> 3. Prepare Project Execution Plan(PXP). <br /> 4. Prepare Safe Work Plan for Topographic Survey. <br /> 5. Prepare for and conduct project kickoff ineeting. <br /> 6. Monthly progress report and updates to graph showing actual expenditures relative to budgeted will <br /> be prepared and submitted with the invoices. <br /> Scope 6-4-10 A-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.