BACKGROUND: <br /> Pump Station History <br /> The K-mart pump station was built by the developer of the K-Mart Plaza in 1974 to serve the <br /> development. The pumps were replaced in 1985 without expanding the capacity of the pump <br /> station. Due to recent growth of the area around the K-Mart Plaza and the potential future growth in <br /> the area, the existing pump station and force main will not handle the projected flow and the purr�p <br /> station needs to be expanded to serve the developing drainage area. <br /> The recommended solution to serve the drainage area for the K-Mart pump station is to replace the <br /> existing K-Mart pump station and also the force main. The new station and force main will be <br /> increased in size to handle the projected flow from the drainage area. <br /> Enlarging the pump station capacity requires the existing force main to be replaced with a larger <br /> diameter pipe and the discharge location changed to an existing sewer with greater capacity. The <br /> existing force main is a 4" diameter pipe installed from the K-mart pump station to a sanitary sewer <br /> at the intersection of Airport Road and Baker Woods Lane. The proposed force main is a 6" <br /> diameter pipe that would be extended to the intersection of East Cantrell Street and Mount Vernon <br /> Place where it will discharge into an existing 12" gravity sewer. <br /> Intergovernmental Agreement <br /> The City is currently under an Intergovernmental Cooperation Agreement with the Sanitary District <br /> of Decatur to design and construct the K-Mart pump station. Under this agreement the City is to <br /> reimburse the SDD up to $138,000 for design and construction costs. The Addendum #1 amends <br /> the original agreement for SDD to construct the K-Mart pump station by adding $349,000 to pay for <br /> the force main construction. <br /> The SDD maintains all of the City's pump stations by agreement. It was decided to amend the <br /> initial agreement to add the force main onto the pump station replacement project to provide a <br /> larger project to potentially receive more cost effective bids. <br /> In accordance with the City's request, the SDD prepared Intergovernmental Cooperation <br /> Agreement Addendum#1 to add the K-Mart Pump Station force main to the agreement. The <br /> agreement includes the following costs: <br /> (a) Design of the New K-Mart Pump Station $ 25,000* <br /> (b) Construction of the New Pump Station and Farce Main $395,000** <br /> (c) Construction Engineering of New Pump Station and Force Main $ 64,000 <br /> (d) Legal Administration $ 3,000 <br /> Total Estimated Costs $487,000 <br /> * Pump Station Design Completed <br /> **Actual Construction Cost will be based on competitive bids. <br /> The replacement work will require the City to secure additional property or easements. This <br /> cost will be determined as property owner negotiations progress. <br /> Costs for construction engineering are enumerated in agreements between the SDD and Bainbridge, <br /> Page � 2 <br />