Engineers with Chastain completed a review of the City's 5 precast deck beam bridges in 2004 and <br /> determined a need to replace the MacArthur/ Stevens Creek bridge deck at a future date. In April, <br /> 2007, the City requested Chastain to update the structure review prior to a contract for design. The <br /> follow-up inspection by Chastain and the Illinois Department of Transportation (IDOT) indicated <br /> the need to replace the entire bridge (i.e. deck, superstructure, and substructure including footings). <br /> Their structural review indicated that the bridge is safe for normal traffic; however, a weight <br /> restriction was placed on the bridge in 2007. In a letter issued on October 30, 2009, IDOT required <br /> the City to post further weight restrictions on this bridge. <br /> Due to the critical nature of the MacArthur/ Stevens Creek Bridge to the area residents for <br /> emergency vehicle access, school busses, etc., the City Council, by previous Council action, <br /> determined that the bridge should be replaced before more significant weight restrictions are placed <br /> on it. <br /> PubGc Meetings Held <br /> A public meeting was held on September 23, 2008, early in the preliminary design process. A <br /> follow-up public meeting was held on September 17, 2009, to present the final design. <br /> Construction staging was a major topic for both meetings. The public was informed that the bridge <br /> would be completed half at a time to allow access and Ash Avenue would be closed at MacArthur <br /> during the construction to enable safer traffic operation through the work zone. The Decatur Park <br /> District also presented its plan to construct a bike path under the bridge and extend it along the <br /> north side of Stevens Creek in future years. The future bike trail is accommodated in the bridge <br /> replacement design. <br /> Project Funding <br /> On April, 14, 2009, the Decatur Urbanized Area Transportation Study(DUATS) allocated $447,408 <br /> in American Reinvestment and Recovery Act (ARRA) funding and $352,592 in Surface <br /> Transportation Urban (STU) funding for a total of$800,000 in Federal funds toward the <br /> replacement of the MacArthur/ Stevens Creek Bridge. At the time of this action, the estimated <br /> construction cost was $1.0 million. The City's share of the cost was planned to be paid from the <br /> Capital Improvement fund. The current construction estimate for the project is just under $1.3 <br /> million and the previous funding plan is not adequate: <br /> On November 10, 2009, the DUATS Technical Committee allocated an additional $240,000 in STU <br /> funding for the bridge to bring Federal funding to $1,040,000 to cover a full 80% of the currently <br /> estimated project cost. As of this writing the Federal Highway Administration has yet to approve <br /> the additional funding. It is proposed that the City's portion of the work cunently estimated at <br /> $260,000 be allocated from the Motor Fuel Tax Fund. The City's 20% share was reallocated from <br /> the Capital fund to the MFT fund to reduce the impact to the General fund. <br /> The City needs to retain the services of a structural engineer to provide construction engineering <br /> assistance during the course of the project. The contractor must provide detailed designs for many <br /> items for the bridge construction; these must be reviewed and approved by a licensed structural <br /> engineer. Additionally, problems, issues, or questions typically arise during the bridge construction <br /> that can only be addressed by the design engineer. Chastain has proposed an amount of$25,000 to <br /> perform the construction assistance required for this project. Engineering cost is planned to be paid <br /> from the Capital fund. <br /> Page � 2 <br />