BACKGROUND: <br /> Engineering Design Necessary <br /> During the heavy rains experienced in early June 2008, a landslide occurred on the south side of <br /> Lincoln Park Drive near Sycamore Street, where the Sangamon River flows adjacent to the <br /> roadway. The slide damaged a portion of the bike trail and threatens to undermine Lincoln Park <br /> Drive. <br /> City staffapproached SKS to perform a survey of the slide area and provide some preliminary work <br /> to assess the damage and recommend repair options to stabilize the slide and keep it from <br /> encroaching onto Lincoln Park Drive. SKS is a local firm specializing in geotechnical work such as <br /> is required to stabilize the Lincoln Park Drive landslide. They have assisted the City on projects <br /> such as this in the past. <br /> After preliminary work was completed, it was necessary to execute a more extensive design effort <br /> to prepare the plans and specifications necessary to contain this damage. On December l, 2008, the <br /> City Council approved a resolution authorizing an agreement with SKS to complete this additional <br /> design, in the amount of$20,000. <br /> Project plans and specifications were prepared by SKS and advertised May 6, 2009 and bids were <br /> opened on May 29, 2009. The lowest, responsible bid was $550,600, from Mid-States General & <br /> Mechanical Contracting Corporation, which was 101.88% above the Engineer's Estimate. On July <br /> 6, 2008, Council approved Resolution R2009-12 rejecting all bids. <br /> It was determined that additional soil information would be helpful in the bidding process. SKS <br /> performed additional soil borings in August 2009 and added those to a revised set of plans. The <br /> scope of the project also increased by 40% as the slope failure had expanded to the east and the <br /> west. <br /> Bid Information and Results <br /> The project plans and specifications for the re-bid of City Project 08-12 were prepared by SKS. <br /> The project was advertised September 16, 2009, and bids were opened on October 9, 2009. The <br /> results for the letting are as follows: <br /> Compared to Engineer's <br /> Estimate <br /> Bidder Bid Price Over(-Under) <br /> Entler Excavating Company, Inc. $291,689.60 (-30.70°/o) Low Bid <br /> Hutchens Excavating $310,045.00 (-26.34%) <br /> Mid-States Gen. & Mech. Contracting Corp. $510,671.00 21.33% <br /> Burdick Plumbing & Heating Co., Inc. $593,905.00 41.10% <br /> Engineer's Estimate $420,899.00 --------- <br /> Staffrecommends that the City Council approve a contract with Entler Excavating Company, Inc., <br /> to perform the Lincoln Drive Slope Repair Project. Entler Excavating Company has successfully <br /> Page � 2 <br />