|
�,
<br /> Project Name: 2009 Trenchless Long Lining Repairs
<br /> Engi�eers Estimate Insituform Technologies Hoerr Constructlon,Inc. VlsuSewer of
<br /> Project Number: 09-28 USA,Inc. 1601-D W.Luthy Dr. Illinois,LLC
<br /> 17988 Ediso�Ave Peorfa,IL 61615 9015 S.Thomas Ave
<br /> City EngineeAng Division Chesterfield,MO 63005 Bridgeview,IL 60455
<br /> Bid Date: Friday,September 18,2009
<br /> Ttme: 10:00 A.M.
<br /> Fund: Sewer Fund
<br /> Organization Code: 79487908
<br /> bJect Code: 489030
<br /> ��m Pay Item Quantl Untt Unit P�ice Total Unit Price Total Unit Price Total Unit Prlce Total
<br /> Number
<br /> 1 SANITARY SEWER LINER,8 INCH 5,56 FT $27.00 $150,201.0 $22.20 $123,498.6 $26.00 $144,638.0 $28.80 $160,214.
<br /> 2 ANITARY SEWER LINER,10 INCH 1,2 FT $32.00 $39,840.0 $24.00 $29,880.0 $27.00 $33,615.0 $34.00 $42,330.0
<br /> 3 ANITARYSEWERLINER,121NCH 1,718 FT $35.00 $60,130.0 $32.00 $54,976.0 $39.00 $67,002.0 $40.25 $69,149.5
<br /> 4 ANITARY SEWER LINER,15 INCH 1,04 FT $57.00 $59,394.0 $45.00 $46,890.0 $45.00 $46,890.0 $52.00 $54,184.0
<br /> 5 ANITARY SEWER LINER,18 INCH 1,06 FT $65.00 $69,355.0
<br /> $43.00 $45,861.0 $50.00 $53,350.0 $61.25 $65,353.7
<br /> 6 SANITARY SEWER LINER,21 INCH 32 FT $85.00 $27,455.0 $55.00 $17,765.0 $73.00 $23,579.0 $78.00 $25,194.0
<br /> 7 PROTRUDING LATERAL CUT-OUT EA $200.00 $800.0 $250.00 $1,000.0 $200.00 $800.0 $300.00 $1,200.0
<br /> 8 ANITARY SEWER LATERAL REINSTATEMENT 25 EA $140.00 $35,420.0 $75.00 $18,975.0 $100.00 $25,300.0 $150.00 $37,950.0
<br /> 9 TORM SEWER LINER,12 INCH 155 FT $35.00 $5,425.0 $50.00 $7,750.0 $39.00 $6,045.0 $40.25 $6,238.7
<br /> 10 TORM SEWER LINER,36 INCH 7 FT $200.00 $14,400.0 $350.00 $25,200.0 $480.00 $34,560.0 $650.00 $46,800.0
<br /> 11 FINAL PROJECT REPORT 1 LS $1,000.00 $1,000.0 $1,000.00 $1,000.0 $500.00 $500.0 $750.00 $750.0
<br /> 12 CURED-IN-PLACE LINER TESTING 2 EA $100.00 $2,500.0 $250.00 $6,250.0 $250.00 $6,250.0 $200.00 $5,000.0
<br /> 13 LTERATIONS,CANCELLATIONS,EXTENTIONS,DEDUCTIONS AND � LS $20,000.00 $20,000.0 $20,000.00 $20,000.0 $20,000.00 $20,000.0 $20,000.00 $20,000.0
<br /> EXTRA WORK
<br /> 14 INITIAL VIDEO INSPECTION 5,00 FT $1.50 $7,500.0 $2.10 $10,500.0 $1.00 $5,000.0 $1.50 $7,500.0
<br /> OTAL BIDS AS CORRECTED $493,420.0 $409,565.6 $467,529.0 $541,864.
<br /> Percent Over Under ENGINEER'S ESTIMATE -16.99% -5.25�0 9.82°/a
<br /> Gi����%�� 9-/f�-��l
<br /> Matthew C.Newell,P.E.,City Engineer Date
<br /> Page 1 of 1
<br />
|