My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-158 AUTHORIZING AN ENGINEERING SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-158 AUTHORIZING AN ENGINEERING SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2015 10:40:46 AM
Creation date
10/21/2015 10:40:45 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-158
Res Ord Title
AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT FOR SUPPLEMENTAL WATER SUPPLY STUDY
Approved Date
9/29/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � H <br /> , . � • <br /> ATTAC�IlV�NT A <br /> FOR <br /> TASK ORDER N0. 14 <br /> FOR <br /> CONTINUING AGREEMENT FOR ENGINEERING SERVICES <br /> Owner: City of Decatur,Illinois <br /> Engineer: Black&Veatch Corporation <br /> Project: Supplemental Water Supply Study <br /> Date: September 30, 2008 <br /> DESCRIPTION OF SCOPE OF SERVICES <br /> Back round <br /> g <br /> Owner is investigating alternatives for increasing the safe yield of its water supply <br /> to meet the projected demand of 49 mgd by 2031. Studies conducted by Owner have <br /> determined that an additional 10,000 acre-feet per year of water are required to meet the <br /> future demands. During most years this volume of water is available from Lake Decatur, <br /> but during periods of severe drought, additional sources will be required to meet the <br /> demand. <br /> In the 2007 study by Homer L. Chastain& Associates (HLC), The Water Plan for <br /> the City of Decatu�, HLC determined that approximately 2,700 acre-feet of additional <br /> storage in Lake Decatur could be obtained by constructing a new water intake at elevation <br /> 600 feet. The proposed new intake, which was conceptualized in the 2003 report by <br /> Engineer, Lake Decatur Water Quality Protection Measures — South Water Treatment <br /> Plant Intake Study, would be located approximately 1,300 feet upstream of the Highway <br /> 51 Bridge. Major components of the intake were 800 feet of underwater 60-inch HDPE <br /> pipe and 1,400 feet of land-based 60-inch tunnel that would connect to Owner's existing <br /> raw water pumping station. Engineer's estimated total cost of the project was <br /> approximately $3 million. HLC inflated the cost to 2007 and added approximately 28,000 <br /> cubic yards of dredging around the intake for a total estimated project cost of <br /> approximately$4.5 million. <br /> The Archer Daniels Midland Company (AD1V� has an agreement with the Owner <br /> to take a significant quantity of water from Lake Decatur for production purposes. ADM <br /> has prepared a proposal for potential alternative sources of water. <br /> A-1 <br />, City of Decatur Task Order No.14 <br /> Rev.09-22-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.