Laserfiche WebLink
Leve13. Detailed Building Evaluation (Five Building Professionals; $6,000) <br /> Architect, Structural Engineer, Mechanical Engineer, Electrical Engineer, Plumbing Engineer, or <br /> Civil Engineer perform detailed evaluation of system by system in addition to above <br /> walkthrough. <br /> *Weeks 1 and 2 or 3 could be combined to save a week's time and $1,500 for <br /> Phase I ($4,000 vs. $5,500). <br /> *XAssume two Level 1 evaluations at this time. <br /> PHASE II <br /> Week Four ($14,000) <br /> Trip 4: Preliminary Options Workshop <br /> Present Preiiminary Options (City%Police Teain) <br /> • Present preliminary evaluation criteria <br /> • Present preliminary analysis <br /> • Receive input from Project Team <br /> Week Six ($14,000) <br /> Trip 5: Present Final Options <br /> • Analysis/Recommendations <br /> • Preliminary Executive Summary <br /> • Report Outline <br /> Week Seven ($5,000) <br /> Trip 6: Final Report <br /> PRESENTATION OPTIONS <br /> 1) Basic —2-dimensional floor plan/site plan diagrams—included—no cost <br /> 2) Upgrades: <br /> a) 3D computer model and two renderings ($�,GGO) � <br /> b) 3D animation ($5,000) � <br /> c) Additional renderings ($1,000/exterior; $1,500/interior) <br /> V�1PGRSUITS\public safety�Decanir Police-Cost Proposal 7-08\Greg Crowe Project Work Plan Attachment by 7MM 0707?OO8.doc <br /> Page 2 of 2 <br />