My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-159 AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-159 AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 11:41:05 AM
Creation date
10/30/2015 11:41:05 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-159
Res Ord Title
AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT FOR HIGH SERVICE PUMP STATION AND DISTRIBUTION STORAGE STUDY
Approved Date
8/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> Page 2 <br /> STRAND July 31, 2007 <br /> ASSOCIATES, INC° <br /> E N G I N E E R S <br /> 8. Develop improvement alternatives related to the south elevated tank overflow, <br /> sizing, and operating range. <br /> 9. Develop alternatives related to improving storage redundancy and maintenance at <br /> the SWTF. <br /> 10. Meet with OWNER to discuss alternatives and select alternatives for more detailed <br /> analysis. <br /> 11. Evaluate up to three selected alternatives using OWNER's calibrated water system <br /> model under anticipated design and demand conditions. <br /> 12. Prepare dra8 report summarizing the STUDY with recommendations for pumping <br /> and storage-related improvements. <br /> 13. Prepare an Opinion of Probable Cost and anticipated project schedule for <br /> recommended alternatives. <br /> 14. Submit five copies of the draft report for OWNER's review. <br /> 15. Meet with OWNER to discuss draft report and incorporate review comments. <br /> 16. Prepare and submit six copies of the Final Report to OWNER. <br /> Responsibilities of OWNER <br /> 1. Provide pertinent data to ENGINEER. <br /> 2. Provide key OWNER staff at reasonable times and with reasonable notice to <br /> participate in meetings. <br /> 3. Provide pump test results as recommended by ENGINEER. <br /> Service Elements Not Included <br /> The following services are not included under the scope of this Agreement. If such services <br /> are required of ENGINEER, they shall be provided by an amendment to this Agreement or <br /> through a separate Agreement with OWNER. <br /> 1. Preparation for and/or Appearance in Litigation on Behalf of OWNER. <br /> 2. Permit and Plan Review Fees. All permit and plan review fees payable to regulatory <br /> agencies shall be paid for by OWNER. Should ENGINEER pay such fees to <br /> expedite approvals, ENGINEER shall be reimbursed by OWNER. <br /> 3. Drawin sg and Specifications. <br /> BLH:ebt�R:�Documents�Agreements�Decatur�IIighSrvcPmpStaDistStrgStdy.2007�Agr\I-624-016.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.