My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-136 AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-136 AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 2:34:47 PM
Creation date
11/2/2015 2:34:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-136
Res Ord Title
AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT FOR WATER SYSTEM IMPROVEMENTS - PHASE II
Approved Date
9/5/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Keith D. Alexander <br /> City of Decatur <br /> STRAND Page 3 <br /> ASSOCIATES, INCe August 23� GOo� <br /> E N G I N E E R S <br /> 25. Specify a new security camera for the sludge lagoon discharge station and nitrate <br /> facility. Cameras will be monitored from the South Water Treatment Plant. <br /> 26. Specify additional camera monitors or a new monitoring system in the operations <br /> room and day lab. <br /> 27. Specify conversion of camera video data storage from tape to digital. <br /> 28. Specify the addition of Basin 1 and 2 turbidity meters signals to SCADA system. <br /> 29. Specify the addition of the raw water streaming current monitor signal to SCADA <br /> system. <br /> 30. Specify modification of the filter effluent valves to accept an analog signal. <br /> 31. Provide opinion of probable construction cost. , <br /> 32. Prepare and submit permit applications with supporting documentation to IEPA. �I <br /> Comments received from IEPA will be addressed as required. �, <br /> 33. Conduct 90 percent design review at Decatur. I <br /> 34. Submit final drawings and specifications to Decatur no later than 25 business days <br /> after 90 percent review meeting. A copy of final drawings and specifications will <br /> also be submitted on read/write compact disk. <br /> 35. Prepare advertisement for bid of PROJECT and distribute drawings and <br /> specifications. <br /> 36. Answer questions from bidders. <br /> 37. Conduct mandatory prebid meeting. <br /> 38. Issue addenda(if necessary). <br /> 39. Review bids received and assist in award of Contract(s). <br /> Service Elements Not Included <br /> The following services are not included under the scope of this Agreement. If such services <br /> are required of the ENGINEER, they shall be provided by an amendment to the Agreement <br /> or through a separate Agreement with the OWNER. <br /> 1. Revising desi�,ns, drawings, specifications, and documents. Any services required <br /> after these items have been previously approved, or where such revisions are <br /> SPZ:1r�R:\Wordp�Agreements_Project Specific�.Agreements�Decatur.1624001spz.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.