Laserfiche WebLink
,� ..,. <br /> B L A N K , W E S S E L I N K , C O O K & A S S O C I A T E S , I N C . <br /> . HARRY M.COOK <br /> . ROBERT M.DEAN <br /> JOSEPH D.CYCOTTE <br /> A R C H I T E C T S <br /> E N G I N E E R S $COTT D.RIGHTER <br /> BWC#06-67 <br /> August 25, 2006 <br /> Mr. Dane Bragg <br /> Assistant City Manager <br /> City of Decatur <br /> #1 Gary K. Anderson Plaza <br /> Decatur, IL 62523-1196 <br /> RE: CITY OF DECATUR <br /> LEC Site Options <br /> ARCHITECTURAUENGINEERING SERVICES <br /> Dear Dane: <br /> This letter is written to submit Blank, Wesselink, Cook 8�Associates (BWC's) proposal for providing a <br /> site feasibility study for altemate locations for the Law Enforcement Center(LEC). Based on our <br /> discussions, we will investigate three potential sites: <br /> 1. Franklin Mall Property <br /> 2. LEC current facility options analysis <br /> 3. A third site unnamed at this time <br /> BWC proposes the following scope of work for the study: <br /> • Determination of site zoning and engineering issues. <br /> • Concept analysis of building size and parking capacity for specific site based on Law <br /> Enforcement needs. <br /> • Determination of available site utilities. <br /> • Budgetary analysis of potential site and building costs <br /> • Prepare a report including the above information <br /> We propose an architectural/engineering services fee Not-to-Exceed $10,000 to prepare the feasibility <br /> reports for up to three sites. <br /> If you have any questions, please call. <br /> Very truly yours, <br /> BLANK, WE ELINK, C�OK&ASSOCIATES, INC. �'� <br /> � � <br /> Daniel Homann, AIA, CSI, CCS <br /> Project Manager <br /> 2 6 2 3 E A S T P E R S H I N G R O A D • P. O. B o X 2 9 1 0 • D E C A T U R, I L 6 2 S 2 4-2 9 1 0 <br /> PHONE: 217/428-0973 • FAX: 217/428-8934 • www.bwcinc.com <br />