Laserfiche WebLink
Person Hour&Cost SubmMal Dofe: D-Jon-04 . � <br /> qiant� Ciy o1 Decetur Ponon How Coat Eatimete Diroet Cmf EaMmale <br /> HLC Project No. 9 <br /> 143.10 84,93 86.13 70.62 51.81 52.60 46.91 48A2 37J0 ' <br /> Pro�ect Location� Leke Decatur Besin 6 Survey Work Fol� Baumann Wovering Scatt Watlers Vollmer M91er Wbers Raney $18.00 $4U.00 $250 $250 $1.00 <br /> Pertner Pro�ect SurveY Party Boat Rotl DraR& Nour DaY DaY �y Each � w <br /> ttam No. ttem Descrionon In cheroe Manaaer ['h�af �i(g,� p� Pereon gg�q� ���_ Ckari�y fgp[� VwNrb pqp( � �p <br /> 1 Proiect Manaaement and AdminisVafion <br /> 1.1 Project Set Up 0.5 0.5 0.5 0.5 0 <br /> Setup computer and hard copy files,budget and schedule <br /> 7 2 Project Progress and Closeout 4 0 <br /> Maintain and closeout files,monitor budget and manpower <br /> 1.3 Pro�ecllnvoicing 0.5 0.5 0.5 0.5 0 <br /> Prepare,check end mail invoices <br /> Peraon Houre 8 1 5 0 0 0 0 0 1 1 0 0 0 0 0 <br /> Personnel Cost $853.87 $143.10 $424.65 $0.00 $0.00 50.00 $0.00 50.00 $48.42 $37.70 $0 $0 $0 SO $0 <br /> SO Llne 11am 7o1a1 <br /> 2 SUNBV Services <br /> 2.1 Collect 8 assemble infortna�on hom clienV ISWS 2 1 0 <br /> 22 Set Benchmark at Mobilizafion Site Shoreline wall 4 4 0 0.5 <br /> 2.3 Recovedset shoreline control for z-secis (11,870 ft) 3 2 16 16 p 2 2 2 50 <br /> (16 cross sec�ons�800 feet per section @ 2 per sectan) <br /> 2.4 Run 16 cross secbons for Basin 6 5 40 40 40 0 5 5 5 <br /> (Avg 31 shots per secfan @ 16 seclions=496 shots) <br /> 2.5 Locate 37 duck blinds by GPS for future resetUng 1 4 4 4 0 0.5 0.5 0.5 <br /> . 2.6 Downbad field da�into office server � � � <br /> Person Hours 188 0 11 2 66 64 44 1 0 0 1 8 7.5 7.5 50 <br /> PersonnalCost $11,444.67 $0.00 $93423 $1M28 $4,660.92 53,315.84 $2,314.51 $48.91 $0.00 $0.00 $18 $320 51,875 51,875 $50 <br /> 54,138 Line Item Total <br /> 3 Office Work <br /> 3.1 Set up honzonfal control points for additional secbons 2 1 10 0 <br /> 3.2 Downbad and evaluate WINOPS aoflware for installatlon 2 4 B 0 <br />� of field work files <br /> 3.3 Prepare survey data W upbad inW WINOPS program 1 8 Q <br /> 3.4 Prepare shoreline coordinates and upbad to WINOPS 1 20 4 <br />' 3.5 Develop dredging templates and upbad to WINOPS 2 2 2p <br /> 3.6 OA/aC all work tor City ot Decatur 2 4 4 <br /> 3.7 Package and transmit infortnation to client � � 2 2 <br /> Person Houre 99 6 15 1 67 0 0 10 0 0 2 0 0 0 0 <br /> PerwnnelCost $7,419.32 $858.60 $1,273.95 $86.13 yt,731.54 $0.00 50.00 $469.10 $0.00 $0.00 $36 $0 $0 $0 $0 <br /> $36 Lme Item Tofal <br /> HLCDkeciCos}Total y1,174 <br /> Tofal Project Penonnel Cwb 519,518 <br /> 7otalProjectDiraetCosts 174 i�w,,,,�cye�,o�Gy_oi_p,cedry�,�pec,o,s�„e,,,,,e�po�wa�r�ueryZ�,zooyws�c�,d�� <br /> Tohl Projeet Cosh j23,692 <br />